Skip to content
Davis-Bacon

MI20260092 (Rev 0)

Coverage: Michigan • Monroe.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR$37.00$23.85
BOILERMAKER$43.50$37.64
BRICKLAYER$41.66$26.53
TILE FINISHER$33.50$23.52
TILE SETTER$40.53$23.62
CARPENTER (Including Acoustical Ceiling Installation; Drywall Hanging, Finishing/Taping; Form Work; Metal Stud Installation; & Scaffold Building)$42.44$31.43
MILLWRIGHT$42.92$39.13
OPERATOR: Power Equipment GROUP 1$51.29$25.35
GROUP 2$48.79$25.35
GROUP 3$48.29$25.35
GROUP 4$47.99$25.35
GROUP 5$47.17$25.35
GROUP 6$46.31$25.35
GROUP 7$45.34$25.35
GROUP 8$43.63$25.35
GROUP 9$35.29$25.35
IRONWORKER Metal Building Erection$23.59$19.35
Reinforcing & Structural$35.50$29.20
LABORER: Landscape & Irrigation GROUP 1$29.93$9.10
GROUP 2$27.71$9.10
LABORER Common or General; Grade Checker; Sandblaster$38.58$15.70
Mason Tender - Brick; Mason Tender - Cement/Concrete$38.80$15.70
Pipelayer$31.71$14.95
PAINTER: Brush and Roller$32.85$20.41
PAINTER: Spray$26.86$17.66
GLAZIER$42.00$25.55
CEMENT MASON/CONCRETE FINISHER$30.63$14.07
PIPEFITTER (Including HVAC Pipe Installation; Excluding HVAC System Installation)$46.71$26.79
PLUMBER, Excludes HVAC Pipe and Unit Installation$46.71$26.79
ROOFER$30.73$26.82
SHEET METAL WORKER, Includes HVAC Duct and Unit Installation$30.80$21.51
TRUCK DRIVER GROUP 1 Dump; Flatbed; Pickup$31.03$0.70
b GROUP 2 Semi$31.18$0.70
b GROUP 3 Lowboy$31.28$0.70
IRONWORKER, ORNAMENTAL$18.48$7.93
TRUCK DRIVER: Tractor Haul Truck$13.57$1.18

Related Wage Determinations

View directory →