Skip to content
Davis-Bacon

MI20260001 (Rev 1)

Coverage: Michigan • Alcona, Alger, Allegan +79.

Published: Jan 09, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
CARPENTER ( Piledriver)$35.57$21.54
CARPENTER (Piledriver)$41.37$28.69
OPERATOR: Power Equipment (Steel Erection) GROUP 1$55.42$28.25
GROUP 2$56.42$28.25
GROUP 3$53.92$28.25
GROUP 4$54.92$28.25
GROUP 5$52.42$28.25
GROUP 6$53.42$28.25
GROUP 7$52.15$28.25
GROUP 8$53.15$28.25
GROUP 9$51.70$28.25
GROUP 10$52.70$28.25
GROUP 11$50.97$28.25
GROUP 12$51.97$28.25
GROUP 13$50.61$28.25
GROUP 14$51.61$28.25
GROUP 15$49.97$28.25
GROUP 16$46.77$28.25
GROUP 17$32.29$15.40
GROUP 18$35.78$28.25
OPERATOR: Power Equipment (Steel Erection) AREA 1 GROUP 1$55.02$28.25
GROUP 2$52.15$28.25
GROUP 3$50.61$28.25
GROUP 4$46.77$28.25
GROUP 5$32.29$15.40
GROUP 6$35.78$28.25
AREA 2 GROUP 1$55.02$28.25
OPERATOR: Power Equipment (Underground construction (including sewer)) AREA 1: GROUP 1$45.98$25.25
GROUP 2$41.25$25.25
GROUP 3$40.52$25.25
GROUP 4$39.95$25.25
GROUP 5$30.35$12.10
AREA 2: GROUP 1$45.98$25.25
Power equipment operators: (AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION) GROUP 1$46.21$25.25
GROUP 2$45.06$25.25
GROUP 3$38.33$25.25
GROUP 4$37.77$25.25
OPERATOR: Power Equipment (Steel Erection) Compressor, welder and forklift$43.30$25.00
Crane operator, main boom & jib 120' or longer$49.77$25.00
Crane operator, main boom & jib 140' or longer$50.07$24.60
Crane operator, main boom & jib 220' or longer$50.66$25.00
Mechanic with truck and tools$48.90$25.00
Oiler and fireman$41.76$25.00
Regular operator$47.12$25.00
OPERATOR: Power Equipment (Sewer Relining) GROUP 1$37.37$15.44
GROUP 2$35.33$15.44
Power equipment operators - gas distribution and duct installation work: GROUP 1$39.78$25.25
GROUP 2$36.05$25.25
Ironworker - pre-engineered metal building erector$23.70$6.95
or greater$39.91$32.32
Bay, Genesee, Lapeer, Livingston (east of Burkhardt Road), Macomb, Midland, Oakland, Saginaw, St. Clair, The University of Michigan, Washtenaw (east of U.S. 23) & Wayne$30.02$28.13
IRONWORKER Ornamental and Structural$36.55$35.93
Reinforcing$36.55$32.87
IRONWORKER Pre-engineered metal buildings$23.59$19.35
All other work$33.00$27.20
IRONWORKER (Including pre-engineered metal building erector)$31.75$22.84
ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE AND WEXFORD COUNTIES - Zone 10) Levels A, B or C$17.45$12.75
class b$18.64$12.90
Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D$16.45$12.75
class a$17.64$12.90
dous waste abatement: (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - Zone 11) Levels A, B or C$25.18$12.90
Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D$22.58$12.90
COUNTY (except the city of Portland); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - Zone 9) Levels A, B or C$21.88$13.26
Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D$20.80$12.90
Laborers - hazardous waste abatement: (ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - Zone 8) Levels A, B or C$23.74$12.95
ers - hazardous waste abatement: (CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (City of Portland); LIVINGSTON COUNTY (west of Oak Grove Rd., including the City of Howell) - Zone 6) Levels A, B or C$26.33$12.95
Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D$24.64$12.90
Laborers - hazardous waste abatement: (GENESEE, LAPEER AND SHIAWASSEE COUNTIES - Zone 7) Levels A, B or C$24.20$13.80
Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D$23.20$13.80
Laborers - hazardous waste abatement: (HILLSDALE, JACKSON AND LENAWEE COUNTIES - Zone 4) Levels A, B or C$27.13$14.95
Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D$24.17$12.90
Laborers - hazardous waste abatement: (LIVINGSTON COUNTY (east of Oak Grove Rd. and south of M-59, excluding the city of Howell); AND WASHTENAW COUNTY - Zone 3) Levels A, B or C$29.93$14.20
Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D$28.93$14.20
Laborers - hazardous waste abatement: (MACOMB AND WAYNE COUNTIES - Zone 1) Levels A, B or C$29.93$16.90
Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D$28.93$16.90
Laborers - hazardous waste abatement: (MONROE COUNTY - Zone 4) Levels A, B or C$31.75$14.90
Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D$31.75$14.90
Laborers - hazardous waste abatement: (OAKLAND COUNTY and the Northeast portion of LIVINGSTON COUNTY bordered by Oak Grove Road on the West and M-59 on the South - Zone 2) Level A, B, C$29.93$16.90
Laborers - hazardous waste abatement: (SANILAC AND ST. CLAIR COUNTIES - Zone 5) Levels A, B or C$26.21$16.62
Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D$24.75$16.35
Laborers - tunnel, shaft and caisson: AREA 1 GROUP 1$30.13$22.75
GROUP 2$32.13$22.75
GROUP 3$28.13$22.75
GROUP 4$23.97$16.93
GROUP 5$24.22$16.93
GROUP 6$24.55$16.93
GROUP 7$17.83$16.93
AREA 2 GROUP 1$32.13$17.95
GROUP 2$34.40$17.95
GROUP 3$28.00$17.45
GROUP 4$29.57$16.93
GROUP 5$25.76$16.93
GROUP 6$26.07$16.93
GROUP 7$25.57$16.93
Laborers - open cut: ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES: GROUP 1$29.98$22.75
GROUP 2$31.98$22.75
GROUP 3$28.14$22.75
GROUP 4$23.71$16.72
GROUP 5$24.17$16.72
GROUP 6$22.00$16.72
GROUP 7$17.84$16.72
ZONE 2 - LIVINGSTON COUNTY (east of M-151 (Oak Grove Rd.)); MONROE AND WASHTENAW COUNTIES: GROUP 1$32.10$17.45
GROUP 2$34.10$17.45
GROUP 3$30.10$17.45
GROUP 4$25.10$16.72
GROUP 5$25.25$16.72
GROUP 6$22.55$16.72
GROUP 7$22.11$16.72
ILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (City of Portland); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (west of M-151 Oak Grove Rd.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES: GROUP 1$30.29$17.45
GROUP 2$32.29$17.45
GROUP 3$28.29$17.45
GROUP 4$23.30$16.72
GROUP 5$23.44$16.72
GROUP 6$20.74$16.72
GROUP 7$22.23$16.72
AND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. JOSEPH, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES: GROUP 1$28.72$18.45
GROUP 2$30.72$18.45
GROUP 3$26.72$18.45
GROUP 4$22.33$16.72
GROUP 5$22.45$16.72
GROUP 6$19.67$16.72
GROUP 7$22.30$16.72
ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES: GROUP 1$29.98$22.75
GROUP 2$30.09$19.45
GROUP 3$26.09$19.45
GROUP 4$22.56$16.72
GROUP 5$22.64$16.72
GROUP 6$19.99$16.72
GROUP 7$22.45$16.72
LABORER (AREA 1) GROUP 1$35.51$14.45
GROUP 2$31.96$14.45
GROUP 3$35.82$14.45
GROUP 4$35.90$14.45
GROUP 5$36.11$14.45
GROUP 6$36.41$14.45
LABORER (AREA 2) GROUP 1$33.37$14.45
GROUP 2$30.03$14.45
GROUP 3$33.81$14.45
GROUP 4$34.16$14.45
GROUP 5$34.03$14.45
GROUP 6$34.37$14.45
LABORER (AREA 3) GROUP 1$32.62$14.45
GROUP 2$33.83$14.45
GROUP 3$33.12$14.45
GROUP 4$33.56$14.45
GROUP 5$33.18$14.45
GROUP 6$33.61$14.45
LABORER (AREA 4) GROUP 1$33.52$13.45
GROUP 2$33.73$13.45
GROUP 3$34.02$13.45
GROUP 4$34.46$13.45
GROUP 5$34.08$13.45
GROUP 6$34.51$13.45
LABORER (DISTRIBUTION WORK) Zone 1$28.41$13.45
Zone 2$24.55$13.45
Zone 3$23.55$13.45
Zone 4$22.92$13.45
Zone 5$22.95$13.45
PAINTER$25.06$14.75
PAINTER Brush and roller$23.74$13.35
Spray, Sandblast, Sign Painting$24.94$13.35
PAINTER$25.49$13.74
PAINTER$24.66$14.99
PAINTER$23.79$12.02
line towers, elevated tanks, steeples, smoke stacks over 40 ft. of falling heights, recovery of lead-based paints and any work associated with industrial plants, except maintenance of industrial plants$29.23$19.11
All other work, including maintenance of industrial plant$29.35$19.05
CEMENT MASON/CONCRETE FINISHER ZONE 1$33.00$18.51
ZONE 2$31.50$18.51
Plumber/Pipefitter - gas distribution pipeline: Welding in conjunction with gas distribution pipeline work$33.03$20.19
All other work$24.19$12.28
Sign Installer AREA 1 GROUP 1$21.78$11.83
GROUP 2$25.27$11.83
AREA 2 GROUP 1$22.03$11.83
GROUP 2$25.02$11.83
TRUCK DRIVER (Underground construction) AREA 1 GROUP 1$23.82$19.04
GROUP 2$23.91$19.04
GROUP 3$24.12$19.04
AREA 2 GROUP 1$24.12$19.04
GROUP 2$24.26$19.04
GROUP 3$24.45$19.04
FLAG PERSON$10.10$0.00
LINE PROTECTOR (ZONE 1: GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE)$26.63$14.45
LINE PROTECTOR (ZONE 2: STATEWIDE (EXCLUDING GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE)$25.03$14.45
Pavement Marking Machine (ZONE 1: GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) Group 1$35.51$14.45
Pavement Marking Machine (ZONE 1: GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE) Group 2$31.96$14.45
Pavement Marking Machine (ZONE 2: STATEWIDE (EXCLUDING GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) Group 1$33.37$14.45
Pavement Marking Machine (ZONE 2: STATEWIDE (EXCLUDING GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE) Group 2$30.03$14.45

Related Wage Determinations

View directory →