Davis-Bacon
MI20260001 (Rev 1)
Coverage: Michigan • Alcona, Alger, Allegan +79.
Published: Jan 09, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER ( Piledriver) | $35.57 | $21.54 |
| CARPENTER (Piledriver) | $41.37 | $28.69 |
| OPERATOR: Power Equipment (Steel Erection) GROUP 1 | $55.42 | $28.25 |
| GROUP 2 | $56.42 | $28.25 |
| GROUP 3 | $53.92 | $28.25 |
| GROUP 4 | $54.92 | $28.25 |
| GROUP 5 | $52.42 | $28.25 |
| GROUP 6 | $53.42 | $28.25 |
| GROUP 7 | $52.15 | $28.25 |
| GROUP 8 | $53.15 | $28.25 |
| GROUP 9 | $51.70 | $28.25 |
| GROUP 10 | $52.70 | $28.25 |
| GROUP 11 | $50.97 | $28.25 |
| GROUP 12 | $51.97 | $28.25 |
| GROUP 13 | $50.61 | $28.25 |
| GROUP 14 | $51.61 | $28.25 |
| GROUP 15 | $49.97 | $28.25 |
| GROUP 16 | $46.77 | $28.25 |
| GROUP 17 | $32.29 | $15.40 |
| GROUP 18 | $35.78 | $28.25 |
| OPERATOR: Power Equipment (Steel Erection) AREA 1 GROUP 1 | $55.02 | $28.25 |
| GROUP 2 | $52.15 | $28.25 |
| GROUP 3 | $50.61 | $28.25 |
| GROUP 4 | $46.77 | $28.25 |
| GROUP 5 | $32.29 | $15.40 |
| GROUP 6 | $35.78 | $28.25 |
| AREA 2 GROUP 1 | $55.02 | $28.25 |
| OPERATOR: Power Equipment (Underground construction (including sewer)) AREA 1: GROUP 1 | $45.98 | $25.25 |
| GROUP 2 | $41.25 | $25.25 |
| GROUP 3 | $40.52 | $25.25 |
| GROUP 4 | $39.95 | $25.25 |
| GROUP 5 | $30.35 | $12.10 |
| AREA 2: GROUP 1 | $45.98 | $25.25 |
| Power equipment operators: (AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION) GROUP 1 | $46.21 | $25.25 |
| GROUP 2 | $45.06 | $25.25 |
| GROUP 3 | $38.33 | $25.25 |
| GROUP 4 | $37.77 | $25.25 |
| OPERATOR: Power Equipment (Steel Erection) Compressor, welder and forklift | $43.30 | $25.00 |
| Crane operator, main boom & jib 120' or longer | $49.77 | $25.00 |
| Crane operator, main boom & jib 140' or longer | $50.07 | $24.60 |
| Crane operator, main boom & jib 220' or longer | $50.66 | $25.00 |
| Mechanic with truck and tools | $48.90 | $25.00 |
| Oiler and fireman | $41.76 | $25.00 |
| Regular operator | $47.12 | $25.00 |
| OPERATOR: Power Equipment (Sewer Relining) GROUP 1 | $37.37 | $15.44 |
| GROUP 2 | $35.33 | $15.44 |
| Power equipment operators - gas distribution and duct installation work: GROUP 1 | $39.78 | $25.25 |
| GROUP 2 | $36.05 | $25.25 |
| Ironworker - pre-engineered metal building erector | $23.70 | $6.95 |
| or greater | $39.91 | $32.32 |
| Bay, Genesee, Lapeer, Livingston (east of Burkhardt Road), Macomb, Midland, Oakland, Saginaw, St. Clair, The University of Michigan, Washtenaw (east of U.S. 23) & Wayne | $30.02 | $28.13 |
| IRONWORKER Ornamental and Structural | $36.55 | $35.93 |
| Reinforcing | $36.55 | $32.87 |
| IRONWORKER Pre-engineered metal buildings | $23.59 | $19.35 |
| All other work | $33.00 | $27.20 |
| IRONWORKER (Including pre-engineered metal building erector) | $31.75 | $22.84 |
| ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE AND WEXFORD COUNTIES - Zone 10) Levels A, B or C | $17.45 | $12.75 |
| class b | $18.64 | $12.90 |
| Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D | $16.45 | $12.75 |
| class a | $17.64 | $12.90 |
| dous waste abatement: (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - Zone 11) Levels A, B or C | $25.18 | $12.90 |
| Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D | $22.58 | $12.90 |
| COUNTY (except the city of Portland); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - Zone 9) Levels A, B or C | $21.88 | $13.26 |
| Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D | $20.80 | $12.90 |
| Laborers - hazardous waste abatement: (ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - Zone 8) Levels A, B or C | $23.74 | $12.95 |
| ers - hazardous waste abatement: (CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (City of Portland); LIVINGSTON COUNTY (west of Oak Grove Rd., including the City of Howell) - Zone 6) Levels A, B or C | $26.33 | $12.95 |
| Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D | $24.64 | $12.90 |
| Laborers - hazardous waste abatement: (GENESEE, LAPEER AND SHIAWASSEE COUNTIES - Zone 7) Levels A, B or C | $24.20 | $13.80 |
| Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D | $23.20 | $13.80 |
| Laborers - hazardous waste abatement: (HILLSDALE, JACKSON AND LENAWEE COUNTIES - Zone 4) Levels A, B or C | $27.13 | $14.95 |
| Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D | $24.17 | $12.90 |
| Laborers - hazardous waste abatement: (LIVINGSTON COUNTY (east of Oak Grove Rd. and south of M-59, excluding the city of Howell); AND WASHTENAW COUNTY - Zone 3) Levels A, B or C | $29.93 | $14.20 |
| Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D | $28.93 | $14.20 |
| Laborers - hazardous waste abatement: (MACOMB AND WAYNE COUNTIES - Zone 1) Levels A, B or C | $29.93 | $16.90 |
| Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D | $28.93 | $16.90 |
| Laborers - hazardous waste abatement: (MONROE COUNTY - Zone 4) Levels A, B or C | $31.75 | $14.90 |
| Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D | $31.75 | $14.90 |
| Laborers - hazardous waste abatement: (OAKLAND COUNTY and the Northeast portion of LIVINGSTON COUNTY bordered by Oak Grove Road on the West and M-59 on the South - Zone 2) Level A, B, C | $29.93 | $16.90 |
| Laborers - hazardous waste abatement: (SANILAC AND ST. CLAIR COUNTIES - Zone 5) Levels A, B or C | $26.21 | $16.62 |
| Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D | $24.75 | $16.35 |
| Laborers - tunnel, shaft and caisson: AREA 1 GROUP 1 | $30.13 | $22.75 |
| GROUP 2 | $32.13 | $22.75 |
| GROUP 3 | $28.13 | $22.75 |
| GROUP 4 | $23.97 | $16.93 |
| GROUP 5 | $24.22 | $16.93 |
| GROUP 6 | $24.55 | $16.93 |
| GROUP 7 | $17.83 | $16.93 |
| AREA 2 GROUP 1 | $32.13 | $17.95 |
| GROUP 2 | $34.40 | $17.95 |
| GROUP 3 | $28.00 | $17.45 |
| GROUP 4 | $29.57 | $16.93 |
| GROUP 5 | $25.76 | $16.93 |
| GROUP 6 | $26.07 | $16.93 |
| GROUP 7 | $25.57 | $16.93 |
| Laborers - open cut: ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES: GROUP 1 | $29.98 | $22.75 |
| GROUP 2 | $31.98 | $22.75 |
| GROUP 3 | $28.14 | $22.75 |
| GROUP 4 | $23.71 | $16.72 |
| GROUP 5 | $24.17 | $16.72 |
| GROUP 6 | $22.00 | $16.72 |
| GROUP 7 | $17.84 | $16.72 |
| ZONE 2 - LIVINGSTON COUNTY (east of M-151 (Oak Grove Rd.)); MONROE AND WASHTENAW COUNTIES: GROUP 1 | $32.10 | $17.45 |
| GROUP 2 | $34.10 | $17.45 |
| GROUP 3 | $30.10 | $17.45 |
| GROUP 4 | $25.10 | $16.72 |
| GROUP 5 | $25.25 | $16.72 |
| GROUP 6 | $22.55 | $16.72 |
| GROUP 7 | $22.11 | $16.72 |
| ILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (City of Portland); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (west of M-151 Oak Grove Rd.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES: GROUP 1 | $30.29 | $17.45 |
| GROUP 2 | $32.29 | $17.45 |
| GROUP 3 | $28.29 | $17.45 |
| GROUP 4 | $23.30 | $16.72 |
| GROUP 5 | $23.44 | $16.72 |
| GROUP 6 | $20.74 | $16.72 |
| GROUP 7 | $22.23 | $16.72 |
| AND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. JOSEPH, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES: GROUP 1 | $28.72 | $18.45 |
| GROUP 2 | $30.72 | $18.45 |
| GROUP 3 | $26.72 | $18.45 |
| GROUP 4 | $22.33 | $16.72 |
| GROUP 5 | $22.45 | $16.72 |
| GROUP 6 | $19.67 | $16.72 |
| GROUP 7 | $22.30 | $16.72 |
| ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES: GROUP 1 | $29.98 | $22.75 |
| GROUP 2 | $30.09 | $19.45 |
| GROUP 3 | $26.09 | $19.45 |
| GROUP 4 | $22.56 | $16.72 |
| GROUP 5 | $22.64 | $16.72 |
| GROUP 6 | $19.99 | $16.72 |
| GROUP 7 | $22.45 | $16.72 |
| LABORER (AREA 1) GROUP 1 | $35.51 | $14.45 |
| GROUP 2 | $31.96 | $14.45 |
| GROUP 3 | $35.82 | $14.45 |
| GROUP 4 | $35.90 | $14.45 |
| GROUP 5 | $36.11 | $14.45 |
| GROUP 6 | $36.41 | $14.45 |
| LABORER (AREA 2) GROUP 1 | $33.37 | $14.45 |
| GROUP 2 | $30.03 | $14.45 |
| GROUP 3 | $33.81 | $14.45 |
| GROUP 4 | $34.16 | $14.45 |
| GROUP 5 | $34.03 | $14.45 |
| GROUP 6 | $34.37 | $14.45 |
| LABORER (AREA 3) GROUP 1 | $32.62 | $14.45 |
| GROUP 2 | $33.83 | $14.45 |
| GROUP 3 | $33.12 | $14.45 |
| GROUP 4 | $33.56 | $14.45 |
| GROUP 5 | $33.18 | $14.45 |
| GROUP 6 | $33.61 | $14.45 |
| LABORER (AREA 4) GROUP 1 | $33.52 | $13.45 |
| GROUP 2 | $33.73 | $13.45 |
| GROUP 3 | $34.02 | $13.45 |
| GROUP 4 | $34.46 | $13.45 |
| GROUP 5 | $34.08 | $13.45 |
| GROUP 6 | $34.51 | $13.45 |
| LABORER (DISTRIBUTION WORK) Zone 1 | $28.41 | $13.45 |
| Zone 2 | $24.55 | $13.45 |
| Zone 3 | $23.55 | $13.45 |
| Zone 4 | $22.92 | $13.45 |
| Zone 5 | $22.95 | $13.45 |
| PAINTER | $25.06 | $14.75 |
| PAINTER Brush and roller | $23.74 | $13.35 |
| Spray, Sandblast, Sign Painting | $24.94 | $13.35 |
| PAINTER | $25.49 | $13.74 |
| PAINTER | $24.66 | $14.99 |
| PAINTER | $23.79 | $12.02 |
| line towers, elevated tanks, steeples, smoke stacks over 40 ft. of falling heights, recovery of lead-based paints and any work associated with industrial plants, except maintenance of industrial plants | $29.23 | $19.11 |
| All other work, including maintenance of industrial plant | $29.35 | $19.05 |
| CEMENT MASON/CONCRETE FINISHER ZONE 1 | $33.00 | $18.51 |
| ZONE 2 | $31.50 | $18.51 |
| Plumber/Pipefitter - gas distribution pipeline: Welding in conjunction with gas distribution pipeline work | $33.03 | $20.19 |
| All other work | $24.19 | $12.28 |
| Sign Installer AREA 1 GROUP 1 | $21.78 | $11.83 |
| GROUP 2 | $25.27 | $11.83 |
| AREA 2 GROUP 1 | $22.03 | $11.83 |
| GROUP 2 | $25.02 | $11.83 |
| TRUCK DRIVER (Underground construction) AREA 1 GROUP 1 | $23.82 | $19.04 |
| GROUP 2 | $23.91 | $19.04 |
| GROUP 3 | $24.12 | $19.04 |
| AREA 2 GROUP 1 | $24.12 | $19.04 |
| GROUP 2 | $24.26 | $19.04 |
| GROUP 3 | $24.45 | $19.04 |
| FLAG PERSON | $10.10 | $0.00 |
| LINE PROTECTOR (ZONE 1: GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE) | $26.63 | $14.45 |
| LINE PROTECTOR (ZONE 2: STATEWIDE (EXCLUDING GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE) | $25.03 | $14.45 |
| Pavement Marking Machine (ZONE 1: GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) Group 1 | $35.51 | $14.45 |
| Pavement Marking Machine (ZONE 1: GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE) Group 2 | $31.96 | $14.45 |
| Pavement Marking Machine (ZONE 2: STATEWIDE (EXCLUDING GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) Group 1 | $33.37 | $14.45 |
| Pavement Marking Machine (ZONE 2: STATEWIDE (EXCLUDING GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE) Group 2 | $30.03 | $14.45 |