Davis-Bacon
ME20260046 (Rev 0)
Coverage: Maine • Cumberland.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER, Includes Form Work | $18.95 | $3.23 |
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $1.13 |
| ELECTRICIAN | $26.40 | $6.66 |
| HIGHWAY/PARKING LOT STRIPING: Laborer | $15.53 | $2.04 |
| INSTALLER - GUARDRAIL | $19.98 | $2.55 |
| IRONWORKER, REINFORCING | $21.85 | $0.00 |
| IRONWORKER, STRUCTURAL | $22.33 | $4.50 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $17.44 | $2.07 |
| LABORER: Common or General | $15.29 | $2.08 |
| LABORER: Epoxy Injector (Concrete) | $13.43 | $1.15 |
| LABORER: Wheelman | $20.34 | $3.43 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $21.07 | $4.39 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $21.97 | $1.74 |
| OPERATOR: Broom/Sweeper | $19.02 | $0.00 |
| OPERATOR: Bulldozer | $21.71 | $5.67 |
| OPERATOR: Grader/Blade | $27.40 | $8.13 |
| OPERATOR: Loader | $19.95 | $2.86 |
| OPERATOR: Mechanic | $24.69 | $8.18 |
| OPERATOR: Milling Machine | $28.51 | $5.44 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $19.98 | $4.95 |
| OPERATOR: Roller (Earth) | $18.57 | $2.50 |
| OPERATOR: Roller Asphalt | $19.30 | $4.09 |
| TRAFFIC CONTROL: Flagger | $9.00 | $0.00 |
| TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper | $17.02 | $5.37 |
| TRUCK DRIVER: Dump Truck | $16.71 | $2.80 |