Skip to content
Davis-Bacon

MD20260114 (Rev 0)

Coverage: Maryland • Dorchester.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
BALANCING TECHNICIAN$26.25$8.29
BRICKLAYER$37.50$14.78
CARPENTER$30.54$18.76
CARPET LAYER$34.12$14.86
CEMENT MASON$30.50$0.00
ELECTRICIAN$48.76$20.01
ELEVATOR MECHANIC$56.36$45.50
INSULATION WORKER$40.02$19.92
IRONWORKER, REINFORCING$21.00$5.49
LABORER AIR TOOL OPERATOR$25.33$4.36
ASPHALT PAVER$25.33$4.36
ASPHALT RAKER$19.00$0.11
BLASTER - DYNAMITE$25.33$4.36
BURNER$25.33$4.36
COMMON$19.00$0.11
CONCRETE PUDDLER$19.00$0.11
CONCRETE SURFACER$25.33$4.36
CONCRETE TENDER$19.00$0.11
CONCRETE VIBRATOR$19.00$0.11
DENSITY GAUGE$19.00$0.11
FIREPROOFER - MIXER$19.00$0.11
FLAGGER$19.00$0.11
GRADE CHECKER$19.00$0.11
HAND ROLLER$19.00$0.11
HAZARDOUS MATERIAL HANDLER$25.33$4.36
JACKHAMMER$19.00$0.11
LANDSCAPING$19.00$0.11
LAYOUT$19.00$0.11
LUTEMAN$19.00$0.11
MASON TENDER$25.33$4.36
MORTAR MIXER$19.00$0.11
PIPELAYER$25.33$4.36
PLASTERER - HANDLER$19.00$0.11
SCAFFOLD BUILDER$25.33$4.36
TAMPER$19.00$0.11
MECHANICAL SYSTEMS SERVICE TECH HVAC Systems$46.21$24.90
PLUMBER$52.50$23.19
POWER EQUIPMENT OPERATOR BULLDOZER$27.95$0.93
CRANE$41.00$18.10
EXCAVATOR$34.18$14.62
FORKLIFT$34.18$14.62
GRADALL$23.00$6.81
LOADER$27.75$8.36
MECHANIC$30.00$2.46
PAVER$21.00$1.58
ROLLER - ASPHALT$25.00$2.89
ROLLER - EARTH$28.60$14.62
SKID STEER (Bobcat)$32.23$14.62
RESILIENT FLOOR$34.12$14.86
ROOFER/WATERPROOFER$52.21$14.91
SHEETMETAL WORKER (including metal roofing)$47.92$24.44
STEAMFITTER/PIPEFITTER$46.21$24.90
TRUCK DRIVER DUMP$23.25$3.52
LOWBOY$29.68$10.51
TACK/TAR TRUCK$28.69$10.51
WATER$29.39$10.51

Related Wage Determinations

View directory →