Davis-Bacon
MD20260060 (Rev 0)
Coverage: Maryland • Anne Arundel.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| SOFT FLOOR LAYER (CARPET) | $34.12 | $14.54 |
| BRICKLAYER | $26.20 | $7.43 |
| CARPENTER, Excludes Drywall Hanging, and Metal Stud Installation | $17.80 | $0.31 |
| CEMENT MASON/CONCRETE FINISHER | $18.92 | $0.00 |
| DRYWALL FINISHER/TAPER | $19.09 | $5.00 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $17.27 | $0.62 |
| ELECTRICIAN | $23.49 | $0.81 |
| IRONWORKER, ORNAMENTAL | $17.31 | $0.00 |
| LABORER: Common or General | $11.95 | $0.00 |
| LABORER: Mason Tender - Brick | $12.26 | $0.00 |
| LABORER: Mason Tender - Cement/Concrete | $14.71 | $0.00 |
| LABORER: Pipelayer | $16.19 | $2.15 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $18.40 | $4.42 |
| OPERATOR: Loader | $20.25 | $2.06 |
| PAINTER (BRUSH AND ROLLER), Excludes Drywall Finishing/Taping | $15.12 | $0.88 |
| PLUMBER (HVAC Pipe Installation Only) | $17.60 | $0.00 |
| PLUMBER, Excludes HVAC Pipe Installation | $22.63 | $0.60 |
| ROOFER | $26.80 | $0.00 |
| SHEET METAL WORKER (HVAC Duct Installation Only) | $17.83 | $1.20 |
| SPRINKLER FITTER (Fire Sprinklers) | $26.06 | $6.52 |
Related Wage Determinations
View directory →Davis-Bacon
MD20260072 (Rev 0)
Maryland • Somerset, Wicomico, Worcester
Davis-Bacon
MD20260002 (Rev 0)
Maryland • Garrett
Davis-Bacon
MD20260066 (Rev 0)
Maryland • Prince George's
Davis-Bacon
MD20260068 (Rev 0)
Maryland • St Mary's
Davis-Bacon
MD20260082 (Rev 0)
Maryland • Anne Arundel
Davis-Bacon
MD20260070 (Rev 0)
Maryland • Baltimore, Carroll, Cecil