Skip to content
Davis-Bacon

MA20260002 (Rev 0)

Coverage: Massachusetts • Worcester.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coating, and finishes all types of mechanical systems$49.10$36.63
Includes the application of all insulating materials, protective coverings, coating, and finishes to all types of mechanical systems$37.50$24.35
BOILERMAKER$50.62$28.82
Bricklayer, Cement Mason, Plasterer & Stonemason$50.81$32.27
Bricklayer, Cement Mason, Plasterer & Stonemason$60.26$33.71
Marble & Tile Finisher$49.32$35.26
Marble, Tile & Terrazzo Workers$64.52$37.51
TERRAZZO FINISHER$63.44$37.33
DIVER TENDER$61.70$35.47
DIVER$78.11$35.47
PILEDRIVERMAN$49.19$35.47
Carpenter/Lather$50.10$31.45
MILLWRIGHT$43.42$33.00
ELECTRICIAN$48.16$36.20
Line Construction: Cableman$58.41$30.19
A Equipment Operator$49.65$26.72
A Groundman$32.13$12.70
A Lineman$58.41$30.19
ELEVATOR MECHANIC$66.41$38.43
Power equipment operators: BUILDING, HEAVY & MARINE GROUP 1$48.73$29.25
Group 1$57.83$33.70
GROUP 2$48.23$29.25
Group 2$57.18$33.70
GROUP 3$32.47$29.25
Group 3$37.02$33.70
GROUP 4$39.89$29.25
Group 4$46.52$33.70
GROUP 5$23.08$29.25
Group 5$25.02$33.70
GROUP 6$27.64$29.25
Group 6$30.85$33.70
Power equipment operators: Group 1$42.88$31.04
A Group 2$42.57$31.04
A Group 3$42.35$31.04
A Group 4$39.12$31.04
A Group 5$38.00$31.04
A Group 6$36.06$31.04
A Group 7$54.38$31.04
A Group 8$44.06$31.04
A Group 9$44.37$31.04
A Group 10$46.38$31.04
A Group 11$47.38$31.04
A Group 12$48.88$31.04
A Group 13$49.88$31.04
A Group 14$50.88$31.04
A Group 15$52.38$31.04
IRONWORKER$57.57$37.67
Laborers: (HEAVY CONSTRUCTION) GROUP 1$38.95$29.70
GROUP 2$39.20$29.70
GROUP 3$39.70$29.70
GROUP 4$39.95$29.70
GROUP 5$39.70$29.70
GROUP 6$40.95$29.70
Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only)$46.20$29.70
Laborers: (FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR) GROUP 1$50.50$29.70
GROUP 2$50.50$29.70
OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES): TEST BORING & WELL DRILLING Driller$50.20$29.70
Laborer$46.20$29.70
OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES): OPEN AIR CASSON, UNDERPINNING WORK & BORING CREW Bottom man$47.35$29.70
Laborers; Top man$46.20$29.70
TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR) GROUP 1$47.95$29.70
GROUP 2$58.43$29.70
GROUP 3$58.43$29.70
GROUP 4$58.43$29.70
GROUP 5$58.43$29.70
GROUP 6$58.43$29.70
CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing) GROUP 1$50.50$29.70
ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR GROUP 1$47.95$29.70
GROUP 3$50.50$29.70
GROUP 4$50.50$29.70
GROUP 5$52.50$29.70
Laborers: (WRECKING) Group 1$46.25$29.70
Group 2$47.00$29.70
Group 3$47.25$29.70
Group 4$42.25$29.70
Group 5$45.35$29.70
Group 6$46.25$29.70
PAINTER NEW CONSTRUCTION: Bridge$56.76$36.00
Brush, Taper$46.26$36.00
Spray, Sandblast$47.66$36.00
REPAINT Bridge$44.32$36.00
Brush, Taper$44.32$36.00
Spray, Sandblast$45.72$36.00
GLAZIER$46.26$36.00
Plumbers and Pipefitters$55.00$31.57
PLUMBER$69.84$36.43
Roofers: All Tear-off and/or removal of any types of roofing and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid$53.53$35.69
SPRINKLER FITTER$53.25$29.75
Sheet metal worker$60.00$48.78
Sheet metal worker$43.48$36.46
Truck drivers: Group 1$40.78$37.35
b Group 2$40.95$37.35
b Group 3$41.02$37.35
b Group 4$41.14$37.35
b Group 5$41.24$37.35
b Group 6$41.53$37.35
b Group 7$41.82$37.35

Related Wage Determinations

View directory →