Davis-Bacon
MA20260002 (Rev 0)
Coverage: Massachusetts • Worcester.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coating, and finishes all types of mechanical systems | $49.10 | $36.63 |
| Includes the application of all insulating materials, protective coverings, coating, and finishes to all types of mechanical systems | $37.50 | $24.35 |
| BOILERMAKER | $50.62 | $28.82 |
| Bricklayer, Cement Mason, Plasterer & Stonemason | $50.81 | $32.27 |
| Bricklayer, Cement Mason, Plasterer & Stonemason | $60.26 | $33.71 |
| Marble & Tile Finisher | $49.32 | $35.26 |
| Marble, Tile & Terrazzo Workers | $64.52 | $37.51 |
| TERRAZZO FINISHER | $63.44 | $37.33 |
| DIVER TENDER | $61.70 | $35.47 |
| DIVER | $78.11 | $35.47 |
| PILEDRIVERMAN | $49.19 | $35.47 |
| Carpenter/Lather | $50.10 | $31.45 |
| MILLWRIGHT | $43.42 | $33.00 |
| ELECTRICIAN | $48.16 | $36.20 |
| Line Construction: Cableman | $58.41 | $30.19 |
| A Equipment Operator | $49.65 | $26.72 |
| A Groundman | $32.13 | $12.70 |
| A Lineman | $58.41 | $30.19 |
| ELEVATOR MECHANIC | $66.41 | $38.43 |
| Power equipment operators: BUILDING, HEAVY & MARINE GROUP 1 | $48.73 | $29.25 |
| Group 1 | $57.83 | $33.70 |
| GROUP 2 | $48.23 | $29.25 |
| Group 2 | $57.18 | $33.70 |
| GROUP 3 | $32.47 | $29.25 |
| Group 3 | $37.02 | $33.70 |
| GROUP 4 | $39.89 | $29.25 |
| Group 4 | $46.52 | $33.70 |
| GROUP 5 | $23.08 | $29.25 |
| Group 5 | $25.02 | $33.70 |
| GROUP 6 | $27.64 | $29.25 |
| Group 6 | $30.85 | $33.70 |
| Power equipment operators: Group 1 | $42.88 | $31.04 |
| A Group 2 | $42.57 | $31.04 |
| A Group 3 | $42.35 | $31.04 |
| A Group 4 | $39.12 | $31.04 |
| A Group 5 | $38.00 | $31.04 |
| A Group 6 | $36.06 | $31.04 |
| A Group 7 | $54.38 | $31.04 |
| A Group 8 | $44.06 | $31.04 |
| A Group 9 | $44.37 | $31.04 |
| A Group 10 | $46.38 | $31.04 |
| A Group 11 | $47.38 | $31.04 |
| A Group 12 | $48.88 | $31.04 |
| A Group 13 | $49.88 | $31.04 |
| A Group 14 | $50.88 | $31.04 |
| A Group 15 | $52.38 | $31.04 |
| IRONWORKER | $57.57 | $37.67 |
| Laborers: (HEAVY CONSTRUCTION) GROUP 1 | $38.95 | $29.70 |
| GROUP 2 | $39.20 | $29.70 |
| GROUP 3 | $39.70 | $29.70 |
| GROUP 4 | $39.95 | $29.70 |
| GROUP 5 | $39.70 | $29.70 |
| GROUP 6 | $40.95 | $29.70 |
| Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only) | $46.20 | $29.70 |
| Laborers: (FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR) GROUP 1 | $50.50 | $29.70 |
| GROUP 2 | $50.50 | $29.70 |
| OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES): TEST BORING & WELL DRILLING Driller | $50.20 | $29.70 |
| Laborer | $46.20 | $29.70 |
| OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES): OPEN AIR CASSON, UNDERPINNING WORK & BORING CREW Bottom man | $47.35 | $29.70 |
| Laborers; Top man | $46.20 | $29.70 |
| TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR) GROUP 1 | $47.95 | $29.70 |
| GROUP 2 | $58.43 | $29.70 |
| GROUP 3 | $58.43 | $29.70 |
| GROUP 4 | $58.43 | $29.70 |
| GROUP 5 | $58.43 | $29.70 |
| GROUP 6 | $58.43 | $29.70 |
| CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing) GROUP 1 | $50.50 | $29.70 |
| ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR GROUP 1 | $47.95 | $29.70 |
| GROUP 3 | $50.50 | $29.70 |
| GROUP 4 | $50.50 | $29.70 |
| GROUP 5 | $52.50 | $29.70 |
| Laborers: (WRECKING) Group 1 | $46.25 | $29.70 |
| Group 2 | $47.00 | $29.70 |
| Group 3 | $47.25 | $29.70 |
| Group 4 | $42.25 | $29.70 |
| Group 5 | $45.35 | $29.70 |
| Group 6 | $46.25 | $29.70 |
| PAINTER NEW CONSTRUCTION: Bridge | $56.76 | $36.00 |
| Brush, Taper | $46.26 | $36.00 |
| Spray, Sandblast | $47.66 | $36.00 |
| REPAINT Bridge | $44.32 | $36.00 |
| Brush, Taper | $44.32 | $36.00 |
| Spray, Sandblast | $45.72 | $36.00 |
| GLAZIER | $46.26 | $36.00 |
| Plumbers and Pipefitters | $55.00 | $31.57 |
| PLUMBER | $69.84 | $36.43 |
| Roofers: All Tear-off and/or removal of any types of roofing and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid | $53.53 | $35.69 |
| SPRINKLER FITTER | $53.25 | $29.75 |
| Sheet metal worker | $60.00 | $48.78 |
| Sheet metal worker | $43.48 | $36.46 |
| Truck drivers: Group 1 | $40.78 | $37.35 |
| b Group 2 | $40.95 | $37.35 |
| b Group 3 | $41.02 | $37.35 |
| b Group 4 | $41.14 | $37.35 |
| b Group 5 | $41.24 | $37.35 |
| b Group 6 | $41.53 | $37.35 |
| b Group 7 | $41.82 | $37.35 |
Related Wage Determinations
View directory →Davis-Bacon
MA20260023 (Rev 0)
Massachusetts • Plymouth
Davis-Bacon
MA20260013 (Rev 0)
Massachusetts • Worcester
Davis-Bacon
MA20260018 (Rev 0)
Massachusetts • Essex
Davis-Bacon
MA20260009 (Rev 0)
Massachusetts • Dukes, Nantucket
Davis-Bacon
MA20260012 (Rev 0)
Massachusetts • Plymouth
Davis-Bacon
MA20260021 (Rev 0)
Massachusetts • Middlesex