Davis-Bacon
KS20260160 (Rev 1)
Coverage: Kansas • Shawnee.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN | $40.64 | $18.29 |
| LINE CONSTRUCTION: LINEMAN | $53.68 | $26.44 |
| POWER EQUIPMENT OPERATOR: LOADER | $39.57 | $21.69 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.09 | $16.83 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $39.57 | $21.69 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $36.09 | $16.83 |
| IRONWORKER | $39.00 | $34.25 |
| LABORER: PIPELAYER | $36.24 | $15.87 |
| CEMENT MASON/CONCRETE FINISHER | $39.06 | $18.71 |
| TRUCK DRIVER: DUMP TRUCK | $28.60 | $19.49 |
| OPERATOR: CRANE | $32.13 | $9.58 |
| OPERATOR: BULLDOZER | $22.34 | $14.08 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.00 | $12.73 |
| LABORER: COMMON OR GENERAL | $18.41 | $2.45 |
| CARPENTER | $28.89 | $8.87 |
| OPERATOR: ROLLER | $30.32 | $15.54 |