Davis-Bacon
KS20260158 (Rev 0)
Coverage: Kansas • Riley.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN | $40.64 | $18.29 |
| POWER EQUIPMENT OPERATOR Bulldozer | $39.57 | $21.69 |
| Forklift | $36.09 | $16.83 |
| Grader/Blade | $39.57 | $21.69 |
| Roller | $39.57 | $21.69 |
| IRONWORKER | $39.00 | $34.25 |
| LABORER (Pipelayer) | $36.24 | $15.87 |
| CEMENT MASON/CONCRETE FINISHER | $39.06 | $18.71 |
| CARPENTER | $28.89 | $8.87 |
| LABORER: Common or General | $21.36 | $0.00 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $27.22 | $16.54 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $24.92 | $0.00 |
| OPERATOR: Crane | $32.13 | $9.58 |
| OPERATOR: Loader | $20.84 | $0.00 |
| TRUCK DRIVER: Dump Truck | $24.47 | $15.63 |