Davis-Bacon
IL20260008 (Rev 1)
Coverage: Illinois • Du Page, Grundy, Kane +4.
Published: Jan 09, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/INSULATOR includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems | $55.02 | $35.75 |
| Fire Stop Technician | $44.02 | $32.76 |
| MATERIAL HANDLER includes preparation, wetting, stripping, removal, scrapping vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not | $41.27 | $32.76 |
| BRICKLAYER | $48.56 | $34.05 |
| MARBLE SETTER | $47.71 | $33.20 |
| TERRAZZO WORKER/SETTER | $48.38 | $30.79 |
| TILE FINISHER | $42.80 | $26.97 |
| TILE SETTER | $49.75 | $30.79 |
| MARBLE FINISHER | $33.95 | $26.03 |
| BRICKLAYER | $44.88 | $26.62 |
| CARPENTER Building | $52.01 | $38.85 |
| Heavy & Highway | $52.01 | $38.85 |
| CARPENTER | $45.61 | $35.31 |
| Carpenter; Millwright; Piledrivermen | $52.01 | $41.41 |
| CARPENTER Carpenter, Floor Layer, Lather, Millwright, and Piledriver | $52.01 | $38.86 |
| CARPENTER Carpenter, Millwright, Piledriver, and Soft Floor Layer Building | $52.01 | $38.86 |
| Residential | $45.61 | $35.31 |
| Line Construction Groundman | $48.44 | $60.05 |
| Lineman and Equipment Operator | $62.10 | $60.05 |
| ELECTRICIAN Building | $59.11 | $42.23 |
| ELECTRICIAN ELECTRICAL TECHNICIAN | $48.71 | $35.87 |
| ELECTRICIAN Residential | $44.40 | $34.59 |
| ELECTRICIAN Building | $51.87 | $69.79 |
| Residential | $44.79 | $82.84 |
| ELECTRICIAN ELECTRICAL TECHNICIAN | $48.00 | $39.85 |
| ELECTRICIAN Residential | $46.87 | $33.38 |
| ELECTRICIAN Building | $52.00 | $45.01 |
| ELECTRICIAN ELECTRICAL TECHNICIAN | $44.00 | $37.91 |
| ELECTRICIAN Building | $60.17 | $43.50 |
| Residential | $48.98 | $32.73 |
| ELECTRICIAN ELECTRICAL TECHNICIAN | $49.70 | $38.45 |
| ELECTRICIAN Building | $41.00 | $105.86 |
| Residential | $39.60 | $81.43 |
| ELECTRICIAN ELECTRICAL TECHNICIAN | $40.90 | $108.35 |
| ELEVATOR MECHANIC | $70.68 | $38.43 |
| ELEVATOR MECHANIC | $61.96 | $38.43 |
| ELEVATOR MECHANIC | $57.99 | $38.43 |
| OPERATOR: Power Equipment GROUP 1 | $64.80 | $51.00 |
| GROUP 2 | $63.50 | $51.00 |
| GROUP 3 | $60.95 | $51.00 |
| GROUP 4 | $59.20 | $51.00 |
| IRONWORKER Sheeter | $62.71 | $46.58 |
| Structural and Reinforcing | $62.46 | $46.58 |
| IRONWORKER, ORNAMENTAL | $59.26 | $44.81 |
| IRONWORKER Fence Erector | $52.25 | $34.31 |
| IRONWORKER Machinery Movers; Riggers; Machinery Erectors | $54.25 | $47.38 |
| Master Riggers | $56.75 | $47.38 |
| IRONWORKER | $48.83 | $39.84 |
| IRONWORKER | $47.80 | $42.50 |
| IRONWORKER | $41.37 | $44.41 |
| LABORER GROUP 1 | $51.40 | $36.94 |
| GROUP 2 | $51.40 | $36.94 |
| GROUP 3 | $51.48 | $36.94 |
| GROUP 4 | $51.50 | $36.94 |
| GROUP 5 | $51.55 | $36.94 |
| GROUP 6 | $51.60 | $36.94 |
| GROUP 7 | $51.63 | $36.94 |
| GROUP 8 | $51.73 | $36.94 |
| GROUP 9 | $51.75 | $36.94 |
| GROUP 10 | $51.85 | $36.94 |
| GROUP 11 | $51.68 | $36.94 |
| GROUP 12 | $52.40 | $36.94 |
| LABORER GROUP 1 | $47.40 | $33.16 |
| GROUP 2 | $47.40 | $33.16 |
| GROUP 3 | $47.48 | $33.16 |
| GROUP 4 | $47.60 | $33.16 |
| GROUP 5 | $47.60 | $33.16 |
| GROUP 6 | $47.75 | $33.16 |
| GROUP 7 | $47.60 | $33.16 |
| GROUP 2 | $51.65 | $36.94 |
| GROUP 3 | $51.40 | $36.94 |
| GROUP 4 | $51.65 | $36.94 |
| GROUP 5 | $51.65 | $36.94 |
| GROUP 6 | $52.10 | $36.94 |
| GROUP 7 | $52.10 | $36.94 |
| GROUP 8 | $51.80 | $36.94 |
| GROUP 2 | $51.48 | $36.94 |
| GROUP 3 | $51.50 | $36.94 |
| GROUP 4 | $51.60 | $36.94 |
| GROUP 5 | $51.60 | $36.94 |
| GROUP 6 | $51.63 | $36.94 |
| GROUP 7 | $51.73 | $36.94 |
| GROUP 8 | $51.75 | $36.94 |
| GROUP 9 | $51.60 | $36.94 |
| GROUP 10 | $51.95 | $36.94 |
| GROUP 11 | $51.60 | $36.94 |
| PAINTER Brush, Decorator, and Paperhanger | $53.05 | $33.91 |
| GLAZIER | $51.55 | $44.09 |
| PAINTER Brush, Drywall Taper/Finisher, Sandblaster, and Spray | $53.05 | $27.63 |
| PLASTERER | $42.25 | $26.65 |
| CEMENT MASON/CONCRETE FINISHER | $50.70 | $40.60 |
| CEMENT MASON/CONCRETE FINISHER | $46.25 | $45.10 |
| CEMENT MASON/CONCRETE FINISHER | $48.50 | $42.82 |
| PLASTERER | $49.65 | $42.17 |
| CEMENT MASON/CONCRETE FINISHER | $38.00 | $24.03 |
| PLUMBER | $45.76 | $26.92 |
| PLUMBER | $60.50 | $39.02 |
| PLUMBER/PIPEFITTER | $41.20 | $29.15 |
| PIPEFITTER | $55.00 | $38.62 |
| ROOFER | $50.25 | $30.43 |
| ROOFER | $38.50 | $27.23 |
| SPRINKLER FITTER | $63.20 | $36.55 |
| Sheet metal worker | $49.10 | $42.91 |
| Sheet Metal Worker ALUMINUM GUTTER WORK | $31.32 | $37.02 |
| SHEET METAL WORKER | $56.35 | $38.65 |
| TRUCK DRIVER 2 or 3 Axle Trucks | $46.12 | $0.30 |
| a 4 Axle Trucks | $46.27 | $0.30 |
| a 5 Axle Trucks | $46.47 | $0.30 |
| a 6 Axle Trucks | $46.67 | $0.30 |
| TRUCK DRIVER 2-3 AXLES | $44.54 | $13.40 |
| a 4 AXLES | $44.69 | $13.40 |
| a 5 AXLES | $44.89 | $13.40 |
| a 6 AXLES | $45.09 | $13.40 |
| TRUCK DRIVER 2-3 AXLES | $45.31 | $0.30 |
| a 4 AXLES | $45.46 | $0.30 |
| a 5 AXLES | $45.66 | $0.30 |
| a 6 AXLES | $45.86 | $0.30 |
Related Wage Determinations
View directory →Davis-Bacon
IL20260002 (Rev 3)
Illinois • Alexander, Champaign, Christian +38
Davis-Bacon
IL20260054 (Rev 1)
Illinois • Perry, Randolph
Davis-Bacon
IL20260066 (Rev 2)
Illinois • Gallatin, Hardin, Pope
Davis-Bacon
IL20260057 (Rev 1)
Illinois • Monroe
Davis-Bacon
IL20260030 (Rev 1)
Illinois • Jersey
Davis-Bacon
IL20260032 (Rev 1)
Illinois • Johnson