Davis-Bacon
ID20260051 (Rev 0)
Coverage: Idaho • Idaho.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER (Form Work Only) | $38.87 | $17.84 |
| ELECTRICIAN | $49.55 | $19.09 |
| POWER EQUIPMENT OPERATOR: Backhoe (45,000 gw & under), Cranes (25 tons & under), Drill (8 in bit and over GROUP 5 | $36.81 | $15.95 |
| Backhoe (45,000-110,000 gw), Crane (25-45 tons), Bulldozer (D-6 and over), Grader/Blade, Front-End Loader(4-8 yds), Paver, Scrapers (all) GROUP 6 | $36.98 | $15.95 |
| Backhoe (over 110,000 gw), Cranes (45-85 tons), Heavy Duty Mechanic, Front End Loader (8-10 yds) GROUP 7 | $37.35 | $15.95 |
| Bulldozer (up to D-6) GROUP 3 | $36.33 | $15.95 |
| Cranes (85 tons & over), Front End Loader (10 yds & over) GROUP 8 | $37.58 | $15.95 |
| Front End Loader (under 4 yds) GROUP 4 | $36.64 | $15.95 |
| Rollers (all) GROUP 1 | $35.80 | $15.95 |
| or, Backhoe (3/4 yds- 31/2 yds), Cranes (up to and including 50 tons), Drilling (bit under 8in), Front End Loader (over 4 yds to and including 7yds), Paver, Scraper (up to and including 40 yds) GROUP 6 | $36.98 | $16.10 |
| Bulldozer, Scraper (over 80 yds to 100 yds) GROUP 8 | $37.58 | $16.10 |
| Cranes (over 50 tons), Drill (bit 8 in and over), Grader (Fine), Front End Loader (over 7 yds), Heavy Duty Mechanic, Scrapers (over 40 yds to 60 yds), Tower Crane GROUP 7 | $37.35 | $16.10 |
| Elevating Grader Operator, Backhoe (under 3/4 yds) GROUP 5 | $36.81 | $16.10 |
| Front End Loader (up to 4yd) GROUP 4 | $36.64 | $16.10 |
| Roller GROUP 3 | $36.33 | $16.10 |
| Scraper (over 100 yds) GROUP 10 | $38.06 | $16.10 |
| IRONWORKER, REINFORCING AND STRUCTURAL | $43.40 | $30.27 |
| LABORER (Common-PIPELINE ONLY) | $33.63 | $16.50 |
| LABORER Asphalt Laborer Includes Asphalt Raker, Shoveler, Spreader, and Distributor | $33.63 | $15.50 |
| Flagger, Common or General Laborer | $33.63 | $15.50 |
| LABORER (PIPELINE ONLY) Common | $26.28 | $12.15 |
| LABORER Asphalt Laborer Includes Asphalt Raker, Shoveler, Spreader, and Distributor Group 4 | $28.48 | $13.00 |
| Common or General Group 2 | $32.15 | $16.30 |
| Flagger Group 1A | $25.84 | $13.00 |
| CEMENT MASON/CONCRETE FINISHER | $40.89 | $18.64 |
| CARPENTER, Excludes Form Work | $29.92 | $5.20 |
| LABORER: Landscape | $22.13 | $11.13 |
| LABORER: Pipelayer | $17.67 | $7.26 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $20.97 | $0.00 |
| OPERATOR: Concrete Batch Plant | $24.94 | $11.96 |
| OPERATOR: Forklift | $21.20 | $0.00 |
| TRUCK DRIVER: Dump Truck | $24.70 | $12.10 |
| TRUCK DRIVER: Lowboy Truck | $21.00 | $12.10 |
| TRUCK DRIVER: Water Truck | $24.48 | $11.67 |
Related Wage Determinations
View directory →Davis-Bacon
ID20260109 (Rev 1)
Idaho • Bannock, Franklin
Davis-Bacon
ID20260110 (Rev 1)
Idaho • Boise, Canyon, Gem +1
Davis-Bacon
ID20260111 (Rev 1)
Idaho • Bonneville, Butte, Jefferson
Davis-Bacon
ID20260097 (Rev 1)
Idaho • Nez Perce
Davis-Bacon
ID20260112 (Rev 1)
Idaho • Kootenai, Nez Perce
Davis-Bacon
ID20260108 (Rev 1)
Idaho • Ada