Skip to content
Davis-Bacon

GA20260067 (Rev 0)

Coverage: Georgia • Burke, Columbia, Lincoln +2.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
CARPENTER$32.68$0.00
CEMENT MASON/CONCRETE FINISHER$28.44$0.00
LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor$16.72$2.23
LABORER: Common or General$15.50$0.00
LABORER: Pipelayer$22.42$0.00
OPERATOR: Backhoe/Excavator/Trackhoe$23.40$3.73
OPERATOR: Bulldozer$22.82$0.00
OPERATOR: Crane$39.31$0.00
OPERATOR: Grader/Blade$26.31$5.43
OPERATOR: Loader$22.81$1.91
OPERATOR: Paver (Asphalt, Aggregate, and Concrete)$23.22$4.10
OPERATOR: Roller$18.51$3.99
TRAFFIC CONTROL: Flagger$14.64$0.00
TRUCK DRIVER: Dump Truck$21.58$3.58

Related Wage Determinations

View directory →