Davis-Bacon
FL20260250 (Rev 0)
Coverage: Florida • Hernando.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER | $24.96 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $23.06 | $0.00 |
| ELECTRICIAN | $24.02 | $3.53 |
| IRONWORKER | $24.16 | $0.00 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $14.00 | $0.86 |
| LABORER: Common or General | $13.83 | $0.00 |
| LABORER: Mason Tender - Cement/Concrete | $20.24 | $2.01 |
| LABORER: Pipelayer | $20.08 | $10.75 |
| LABORER: Grade Checker | $17.21 | $0.00 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $22.22 | $8.72 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $23.46 | $1.25 |
| OPERATOR: Boom | $33.61 | $11.50 |
| OPERATOR: Broom/Sweeper | $19.52 | $0.82 |
| OPERATOR: Bulldozer | $25.19 | $0.00 |
| OPERATOR: Crane | $31.12 | $11.50 |
| OPERATOR: Grader/Blade | $25.02 | $0.00 |
| OPERATOR: Loader | $19.85 | $5.07 |
| OPERATOR: Mechanic | $27.61 | $1.00 |
| OPERATOR: Milling Machine | $19.68 | $0.00 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $23.08 | $2.65 |
| OPERATOR: Piledriver | $22.98 | $0.00 |
| OPERATOR: Roller | $20.80 | $3.27 |
| OPERATOR: Scraper | $15.54 | $0.00 |
| OPERATOR: Screed | $23.77 | $0.00 |
| OPERATOR: Tractor | $16.91 | $0.66 |
| PAINTER | $21.02 | $0.00 |
| TRAFFIC CONTROL PERSON | $15.86 | $1.52 |
| TRUCK DRIVER: Dump Truck | $18.60 | $6.43 |
| TRUCK DRIVER: Flatbed Truck | $20.00 | $0.00 |
| TRUCK DRIVER: Lowboy Truck | $20.15 | $5.48 |
| TRUCK DRIVER: Off the Road Truck | $16.55 | $0.00 |
| TRUCK DRIVER: Water Truck | $18.27 | $0.00 |
| TRUCK DRIVER: Distributor Truck | $23.46 | $0.00 |