Davis-Bacon
FL20260244 (Rev 0)
Coverage: Florida • Clay.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN | $35.60 | $14.97 |
| CARPENTER | $19.33 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $20.00 | $0.82 |
| IRONWORKER | $24.16 | $0.00 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $16.33 | $0.00 |
| LABORER: Common or General | $15.39 | $0.00 |
| LABORER: Mason Tender - Cement/Concrete | $20.24 | $2.01 |
| LABORER: Pipelayer | $17.00 | $0.70 |
| LABORER: Grade Checker | $17.21 | $0.00 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $19.16 | $0.00 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $15.85 | $0.00 |
| OPERATOR: Boom | $33.61 | $11.50 |
| OPERATOR: Broom/Sweeper | $15.13 | $0.00 |
| OPERATOR: Bulldozer | $19.03 | $0.00 |
| OPERATOR: Crane | $29.95 | $0.00 |
| OPERATOR: Grader/Blade | $19.34 | $0.00 |
| OPERATOR: Loader | $16.87 | $0.00 |
| OPERATOR: Mechanic | $31.30 | $0.00 |
| OPERATOR: Milling Machine | $19.68 | $0.00 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $17.77 | $0.00 |
| OPERATOR: Piledriver | $22.98 | $0.00 |
| OPERATOR: Roller | $15.21 | $0.00 |
| OPERATOR: Scraper | $15.54 | $0.00 |
| OPERATOR: Screed | $18.35 | $0.00 |
| OPERATOR: Tractor | $16.91 | $0.66 |
| PAINTER | $21.02 | $0.00 |
| TRAFFIC CONTROL PERSON | $14.91 | $0.00 |
| TRUCK DRIVER: Dump Truck | $18.00 | $0.74 |
| TRUCK DRIVER: Flatbed Truck | $19.46 | $0.00 |
| TRUCK DRIVER: Lowboy Truck | $22.16 | $0.00 |
| TRUCK DRIVER: Off the Road Truck | $16.91 | $0.00 |
| TRUCK DRIVER: Water Truck | $18.27 | $0.00 |
| TRUCK DRIVER: Distributor Truck | $19.18 | $0.00 |