Davis-Bacon
FL20260225 (Rev 0)
Coverage: Florida • Sarasota.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 |
| ELECTRICIAN (Includes Low Voltage Wiring) | $33.11 | $14.59 |
| ELEVATOR MECHANIC | $51.83 | $38.43 |
| ft boom | $39.01 | $16.85 |
| Group 2 Lattice under 150 ton, 100 ton up to 250 ton hydro cranes | $38.01 | $16.85 |
| Group 3 Cranes not described above; Mechanics | $37.01 | $16.85 |
| Group 4 Forklift | $35.01 | $16.85 |
| IRONWORKER, STRUCTURAL | $35.25 | $17.32 |
| IRONWORKER, ORNAMENTAL | $28.90 | $15.66 |
| CARPENTER | $20.30 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $14.85 | $0.60 |
| IRONWORKER, REINFORCING | $26.37 | $12.65 |
| LABORER: Common or General, Including Cement Mason Tending | $12.83 | $0.00 |
| LABORER: Pipelayer | $14.00 | $1.40 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $22.07 | $8.80 |
| OPERATOR: Bulldozer | $15.40 | $1.90 |
| OPERATOR: Grader/Blade | $18.97 | $0.00 |
| OPERATOR: Loader | $14.00 | $1.40 |
| OPERATOR: Roller | $14.43 | $4.78 |
| PAINTER: Brush, Roller and Spray | $14.72 | $2.13 |
| PIPEFITTER, Includes HVAC Pipe Installation | $20.59 | $7.49 |
| PLUMBER | $21.14 | $8.11 |
| ROOFER | $19.00 | $1.17 |
| SHEET METAL WORKER, Includes HVAC Duct Installation | $19.05 | $4.47 |
| SPRINKLER FITTER (Fire Sprinklers) | $21.86 | $7.94 |
| TILE SETTER | $18.01 | $0.00 |
| TRUCK DRIVER: Dump Truck | $13.22 | $2.12 |
| TRUCK DRIVER: Lowboy Truck | $14.24 | $0.00 |