Davis-Bacon
FL20260218 (Rev 0)
Coverage: Florida • Orange.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 |
| CARPENTER (Includes Form Work) | $28.65 | $13.80 |
| ELEVATOR MECHANIC | $53.73 | $38.43 |
| OPERATOR: Forklift | $23.25 | $9.20 |
| OPERATOR: Mechanic | $32.05 | $9.20 |
| OPERATOR: Oiler | $23.50 | $9.20 |
| OPERATOR: Crane Gantry Crane; Bridge Crane | $36.00 | $15.10 |
| Tower Crane; Crawler Crane; Truck Crane; Hydro Crane | $36.00 | $15.10 |
| IRONWORKER, ORNAMENTAL | $28.90 | $15.66 |
| SPRINKLER FITTER (Fire Sprinklers) | $35.03 | $24.00 |
| SHEET METAL WORKER (Includes HVAC Duct Installation) | $25.75 | $16.92 |
| CEMENT MASON/CONCRETE FINISHER | $19.39 | $0.00 |
| ELECTRICIAN, Includes Low Voltage Wiring | $19.58 | $6.39 |
| IRONWORKER, REINFORCING | $22.81 | $11.58 |
| IRONWORKER, STRUCTURAL | $17.92 | $0.00 |
| LABORER: Common or General, Including Cement Mason Tending and Pipelaying | $13.59 | $4.28 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $18.69 | $3.27 |
| OPERATOR: Bulldozer | $15.40 | $1.90 |
| OPERATOR: Grader/Blade | $18.97 | $0.00 |
| OPERATOR: Loader | $17.83 | $0.00 |
| OPERATOR: Roller | $14.43 | $4.78 |
| PAINTER: Brush, Roller and Spray | $13.22 | $0.00 |
| PIPEFITTER, Includes HVAC Pipe and Unit Installation | $22.29 | $7.72 |
| PLUMBER | $19.42 | $0.00 |
| ROOFER | $17.60 | $1.39 |
| TILE SETTER | $17.25 | $1.74 |
| TRUCK DRIVER: Dump Truck | $12.95 | $2.28 |
| TRUCK DRIVER: Lowboy Truck | $14.24 | $0.00 |