Davis-Bacon
FL20260196 (Rev 0)
Coverage: Florida • Brevard.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 |
| ELEVATOR MECHANIC | $53.73 | $38.43 |
| OPERATOR: Forklift | $23.25 | $9.20 |
| OPERATOR: Mechanic | $32.05 | $9.20 |
| OPERATOR: Oiler | $23.50 | $9.20 |
| OPERATOR: Crane Gantry Crane; Bridge Crane | $36.00 | $15.10 |
| Tower Crane; Crawler Crane; Truck Crane; Hydro Crane | $36.00 | $15.10 |
| IRONWORKER, ORNAMENTAL | $28.90 | $15.66 |
| PIPEFITTER (Includes HVAC Pipe and Unit Installation) | $41.60 | $22.68 |
| SPRINKLER FITTER (Fire Sprinklers) | $35.03 | $24.00 |
| CARPENTER, Includes Form Work | $19.33 | $2.73 |
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $0.00 |
| ELECTRICIAN, Includes Low Voltage Wiring | $17.38 | $4.46 |
| IRONWORKER, REINFORCING | $22.81 | $11.58 |
| IRONWORKER, STRUCTURAL | $19.80 | $0.00 |
| LABORER: Common or General, Including Cement Mason Tending | $12.07 | $1.81 |
| LABORER: Pipelayer | $15.00 | $0.54 |
| OPERATOR: Backhoe/Excavator/Trackhoe | $19.00 | $3.43 |
| OPERATOR: Bulldozer | $15.40 | $1.90 |
| OPERATOR: Grader/Blade | $18.97 | $0.00 |
| OPERATOR: Loader | $17.83 | $0.00 |
| OPERATOR: Roller | $14.43 | $4.78 |
| PAINTER: Brush, Roller and Spray | $13.22 | $0.00 |
| PLUMBER | $23.88 | $5.69 |
| ROOFER | $17.60 | $1.39 |
| SHEET METAL WORKER, Includes HVAC Duct Installation | $23.50 | $0.57 |
| TILE SETTER | $17.25 | $1.74 |
| TRUCK DRIVER: Dump Truck | $12.95 | $2.28 |
| TRUCK DRIVER: Lowboy Truck | $14.24 | $0.00 |