Davis-Bacon
FL20260082 (Rev 0)
Coverage: Florida • Polk.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ft boom | $39.01 | $16.85 |
| Group 2 Lattice under 150 ton, 100 ton up to 250 ton hydro cranes | $38.01 | $16.85 |
| IRONWORKER, REINFORCING AND STRUCTURAL | $35.25 | $17.32 |
| BRICKLAYER | $20.00 | $0.00 |
| CARPENTER, Includes Cabinet Installation | $11.37 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.14 | $0.00 |
| ELECTRICIAN | $12.66 | $0.00 |
| IRONWORKER, ORNAMENTAL | $12.60 | $0.00 |
| LABORER: Common or General | $9.85 | $0.00 |
| LABORER: Mason Tender - Brick | $11.51 | $0.00 |
| LABORER: Mason Tender - Cement/Concrete | $10.46 | $0.00 |
| LABORER: Pipelayer | $11.79 | $0.00 |
| LABORER: Roof Tearoff | $9.00 | $0.00 |
| LABORER: Landscape and Irrigation | $8.26 | $0.00 |
| OPERATOR: Asphalt Paver | $12.07 | $0.00 |
| OPERATOR: Backhoe Loader Combo | $17.04 | $0.00 |
| OPERATOR: Backhoe/Excavator | $12.56 | $0.00 |
| OPERATOR: Bulldozer | $12.14 | $0.00 |
| OPERATOR: Distributor | $11.57 | $0.00 |
| OPERATOR: Forklift | $17.38 | $0.00 |
| OPERATOR: Grader/Blade | $15.50 | $0.00 |
| OPERATOR: Loader | $11.59 | $0.00 |
| OPERATOR: Roller | $11.02 | $0.00 |
| OPERATOR: Screed | $11.08 | $0.00 |
| OPERATOR: Trackhoe | $15.68 | $0.00 |
| OPERATOR: Tractor | $10.20 | $0.00 |
| PLUMBER | $13.22 | $0.00 |
| ROOFER, Includes Built Up, Modified Bitumen, and Shake & Shingle Roofs (Excludes Metal Roofs) | $13.33 | $0.00 |
| ROOFER: Metal Roof | $16.99 | $0.00 |
| SHEET METAL WORKER, Excludes Metal Roof Installation | $9.50 | $0.00 |
| TRUCK DRIVER, Includes Dump Truck | $10.22 | $0.00 |
| TRUCK DRIVER: Lowboy Truck | $12.10 | $0.00 |