Davis-Bacon
FL20260059 (Rev 0)
Coverage: Florida • Collier.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| OPERATOR: Crane All Cranes 75 Tons and below | $37.07 | $14.90 |
| All Cranes Over 300 Ton, Electric Tower, Luffing Boom Cranes | $40.40 | $14.90 |
| Cranes 130-300 Ton | $39.38 | $14.90 |
| Cranes 76 ton to 129 Ton | $37.57 | $14.90 |
| OPERATOR: Oiler | $27.53 | $14.90 |
| IRONWORKER, STRUCTURAL AND REINFORCING | $28.84 | $15.72 |
| BRICKLAYER | $20.00 | $0.00 |
| CARPENTER | $13.66 | $2.67 |
| CEMENT MASON/CONCRETE FINISHER | $12.83 | $0.00 |
| ELECTRICIAN | $13.15 | $0.00 |
| IRONWORKER, ORNAMENTAL | $15.25 | $0.00 |
| LABORER: Common or General | $9.18 | $0.00 |
| LABORER: Mason Tender - Brick | $11.51 | $0.00 |
| LABORER: Mason Tender - Cement/Concrete | $10.94 | $0.00 |
| LABORER: Pipelayer | $15.14 | $0.00 |
| LABORER: Roof Tearoff | $9.00 | $0.00 |
| LABORER: Landscape and Irrigation | $13.54 | $0.00 |
| OPERATOR: Asphalt Paver | $12.40 | $0.00 |
| OPERATOR: Backhoe Loader Combo | $17.04 | $0.00 |
| OPERATOR: Backhoe/Excavator | $15.25 | $0.00 |
| OPERATOR: Bulldozer | $14.50 | $2.00 |
| OPERATOR: Distributor | $11.41 | $0.00 |
| OPERATOR: Forklift | $17.50 | $0.00 |
| OPERATOR: Grader/Blade | $14.00 | $0.00 |
| OPERATOR: Loader | $12.17 | $0.00 |
| OPERATOR: Roller | $10.62 | $0.00 |
| OPERATOR: Screed | $10.93 | $0.00 |
| OPERATOR: Trackhoe | $14.81 | $0.00 |
| OPERATOR: Tractor | $10.20 | $0.00 |
| PAINTER: Brush, Roller and Spray | $14.56 | $0.00 |
| PLUMBER | $13.45 | $0.00 |
| ROOFER, Includes Built Up, Modified Bitumen, and Shake & Shingle Roofs (Excludes Metal Roofs) | $15.65 | $0.00 |
| ROOFER: Metal Roof | $16.99 | $0.00 |
| SHEET METAL WORKER, Excludes Metal Roof Installation | $9.85 | $0.38 |
| TRUCK DRIVER, Includes Dump Truck | $10.22 | $0.00 |
| TRUCK DRIVER: Lowboy Truck | $12.10 | $0.00 |