Skip to content
Davis-Bacon

CT20260004 (Rev 0)

Coverage: Connecticut • Litchfield, Windham.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
Power equipment operators: Front end loaders (3 cy up to 7 cy)$39.98$25.60
Front end loaders (3 cy up to 7 cy$50.22$29.80
HVAC MECHANIC$11.00$1.49
INSULATOR - BATT$8.40$2.60
Unskilled$13.17$2.89
PAINTER (Excluding Drywall Finishing)$8.96$0.00
Excluding HVAC Work)$14.25$2.31
Power equipment operators: Backhoes$16.87$2.45
Bulldozers$13.40$1.29
TRUCK DRIVER (3 Axle)$13.69$2.05

Related Wage Determinations

View directory →