Davis-Bacon
AZ20260026 (Rev 1)
Coverage: Arizona • Gila.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATOR: (DRILL RIG/AUGER) | $35.56 | $18.12 |
| IRONWORKER | $39.50 | $19.91 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.91 | $9.26 |
| LABORER: MASON TENDER | $29.91 | $9.26 |
| LABORER: PIPELAYER | $31.98 | $9.26 |
| TRUCK DRIVER: WATER | $31.53 | $3.36 |
| TRUCK DRIVER: DUMP | $24.50 | $2.75 |
| TRAFFIC CONTROL | $20.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT (ASPHALT, AGGREGATE, & CONCRETE) | $30.40 | $0.06 |
| POWER EQUIPMENT OPERATOR: OILER | $31.86 | $10.01 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE | $36.90 | $3.81 |
| POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER | $38.84 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $38.76 | $9.20 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE | $39.48 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE / DERRICKS | $45.76 | $13.82 |
| POWER EQUIPMENT OPERATOR: CONCRETE SCREED | $33.90 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER | $34.26 | $0.00 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $32.53 | $0.00 |
| PAINTER: SIGN AND DISPLAY ERECTOR | $19.06 | $2.99 |
| LABORER: GENERAL | $28.65 | $5.25 |
| CARPENTER: FORMWORK CONCRETE | $33.16 | $10.71 |