Davis-Bacon
AZ20260023 (Rev 0)
Coverage: Arizona • Apache.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATOR: Drill Rig/Auger | $35.56 | $18.12 |
| Ironworker | $39.50 | $19.91 |
| Laborer: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $29.91 | $9.26 |
| Laborer: Mason Tender | $29.91 | $9.26 |
| Laborer: Pipelayer | $31.98 | $9.26 |
| Carpenter: Formwork Concrete | $33.16 | $10.71 |
| Laborer: General | $24.09 | $2.07 |
| Painter: Sign and Display Erector | $19.06 | $2.99 |
| Power Equipment Operator: Bobcat/Skid Steer/Skid Loader | $32.53 | $0.00 |
| Power Equipment Operator: Compactor/Roller | $23.71 | $4.05 |
| Power Equipment Operator: Concrete Screed | $33.90 | $0.00 |
| Power Equipment Operator: Crane / Derricks | $45.44 | $13.77 |
| Power Equipment Operator: Excavator/Trackhoe | $39.48 | $0.00 |
| Power Equipment Operator: Forklift | $38.31 | $9.20 |
| Power Equipment Operator: Loader/Front End Loader | $26.07 | $3.80 |
| Power Equipment Operator: Motor Grader/Blade | $36.90 | $3.81 |
| Power Equipment Operator: Oiler | $31.86 | $10.01 |
| Power Equipment Operator: Paver/Spreader/Finish equipment (asphalt, aggregate, & concrete) | $30.40 | $0.06 |
| Traffic Control | $19.43 | $2.54 |
| Truck Driver: Dump | $24.50 | $2.72 |
| Truck Driver: Water | $27.38 | $0.00 |
Related Wage Determinations
View directory →Davis-Bacon
AZ20260061 (Rev 0)
Arizona • Yavapai
Davis-Bacon
AZ20260043 (Rev 0)
Arizona • Coconino, Mohave, Yavapai
Davis-Bacon
AZ20260053 (Rev 0)
Arizona • Santa Cruz
Davis-Bacon
AZ20260006 (Rev 0)
Arizona • Maricopa, Mohave, Pima +2
Davis-Bacon
AZ20260044 (Rev 0)
Arizona • Coconino
Davis-Bacon
AZ20260046 (Rev 0)
Arizona • Mohave