Skip to content
Davis-Bacon

AL20260119 (Rev 0)

Coverage: Alabama • Hale, Pickens, Tuscaloosa.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
CARPENTER, Includes Form Work$20.26$8.59
CEMENT MASON/CONCRETE FINISHER, Includes Water Sewer Lines$13.71$0.00
ELECTRICIAN$19.98$5.53
LABORER: Common or General, Includes Water Sewer Lines$11.48$0.00
LABORER: Pipelayer, Includes Water Sewer Lines$13.91$2.04
OPERATOR: Backhoe/Excavator/Trackhoe, Includes Water Sewer Lines$19.31$0.00
OPERATOR: Bulldozer, Includes Water and Sewer Lines$12.00$0.00
OPERATOR: Loader, Includes Water Sewer Lines$17.64$2.14
TRUCK DRIVER: Dump Truck, Includes Water Sewer Lines$12.25$2.58

Related Wage Determinations

View directory →