Skip to content
Davis-Bacon

AL20260110 (Rev 0)

Coverage: Alabama • Mobile.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
POWER EQUIPMENT OPERATOR (PIPELINE) Backhoe, Excavator, Trackhoe$48.89$18.00
Bulldozer$48.89$18.00
CARPENTER, Includes Form Work$19.05$7.86
CEMENT MASON/CONCRETE FINISHER, Includes Water Sewer Lines$13.78$0.00
ELECTRICIAN$19.56$0.00
LABORER: Common or General, Includes Water Sewer Lines$15.21$6.16
LABORER: Pipelayer, Includes Water Sewer Lines$11.95$0.00
OPERATOR: Backhoe/Excavator/Trackhoe, Includes Water Sewer Lines (Excludes, PIPELINE)$13.56$0.00
OPERATOR: Loader, Includes Water Sewer Lines$17.64$2.14
TRUCK DRIVER: Dump Truck, Includes Water Sewer Lines$12.56$2.12

Related Wage Determinations

View directory →