Warminster Township Public Works Aboveground Storage Tank Upgrades
This project involves the upgrade and repair of one (1) 10,000 gallon aboveground diesel fuel tank, one (1) 10,000 gallon aboveground gasoline fuel tank and the fuel dispensing pumps located in the Warminster Township Public Works yard (910 W. Bristol Road, Warminster,…
Posted: Aug 03, 2023Due: Aug 24, 2023• Closed