Bridge deck replacement over Middle River near Carrington, the total length of improvement being 0.115 miles
Bridge deck replacement project over Middle River with a total improvement length of 0.115 miles.
Filter and search for solicitations.
Bridge deck replacement project over Middle River with a total improvement length of 0.115 miles.
Seeking comprehensive building construction services including demolition, sitework, and multiple technical systems installation.
Professional services sought for pet adoption center design focusing on operational efficiency, animal welfare, and humane care standards with specialized functional areas and advanced environmental control systems.
Project involves supply and placement of approximately 119,367 square yards of asphalt rejuvenator AR-26, to be paid for by the square yard.
Project involves construction of premium cabins and campsites, comfort station upgrades, and connecting park sanitary facilities to the city sewer system.
Ada Improvements From Route 340 To Baxter Road Near Ballwin, The Total Length Of Improvement Being 0 Miles
Comprehensive renovation project for the MET Building including exterior masonry cleaning and repairs, HVAC system replacement, elevator modernization, and select interior improvements to enhance functionality.
Two bridge replacements over BNSF Railway requiring various construction work including clearing, excavation, and aggregate installation.
Seeking supplier to provide mechanical filters including oil/hydraulic, fuel, and air filters with 24-hour delivery requirement.
Bridge replacement project over BNSF Railway with a total improvement length of 0.316 miles.
Seeking guardrail improvements at various locations with installation, maintenance, and repair services required.
Solicitation for a Geoprobe® 3135GT Tracked Geotechnical Drill Rig with comprehensive accessories including a 105DP Drill Mast, GR10 Geotech Head Assembly, and multiple winch kits.
Seeking OEM Aramid Nomex hose (7/8 inch, 25ft) that meets all specifications. No substitutes will be accepted.
Signal Improvements At Various Locations In The Southeast District, The Total Length Of Improvement Being 0 Miles
IT network upgrade requiring replacement of end-of-life technology with specific Cisco Catalyst, Meraki, and HPE Aruba networking equipment and licensing.
Seeking contractor for a 7.591-mile culvert extension project involving highway maintenance, pavement marking, and resurfacing work.
Faa Type Iv Glass Beads - Spirit Of St Louis Airport
Request for quotation for injection fuel supply tube for cylinder 6 ISL 35-7500 and 5976 fuel system parts and accessories.