RFQ-0040-2026 air Handler VFD Installation
Detailed Scope of work is attached. Submit quotes to Procurementservices@bridgew.edu and contact for additional information.
Checking federal, state, local, university, DIBBS, GSA, agency, NAICS, PSC, and source metadata fields.
Filter and search for solicitations and contract listings.
Detailed Scope of work is attached. Submit quotes to Procurementservices@bridgew.edu and contact for additional information.
UMLOW-2026-1055 Olney New Chiller at Olney Hall consists of but not limited installation of a new chiller. DCAMM cert HVAC. Bid/Contract docs at…
Accepting bids for the following towns: Ayer, Quabbin Regional School District, Berlin, Millville, Oakham, Paxton, Princeton, Sterling, Sutton, Upton,…
Bid Documents may be viewed electronically: https://www.bridgew.edu/office/procurement/bid-listings Then click on Jaggaer Portal
Official Bonfire public listing for Great Lakes Water Authority. Reference REQ-0007694. Open the official portal for full documentation, attachments, and…
Official Bonfire public listing for Great Lakes Water Authority. Reference REQ- 0006884. Open the official portal for full documentation, attachments, and…
DCR is seeking pre-qualified vendors to establish a Master Service Agreement (MSA) to provide purchase of waterfront, pool, and lifeguard supplies and…
FY2027 Water Department Supplies and Materials
In accordance with M.G.L. c.30B, Section 6, the Town of Concord (the "Town") invites sealed written proposals from qualified laboratories to provide drinking…
Scope of work includes but not limited to, full depth reclamation, pavement milling, hot mix asphalt paving, installation of new curbing, removing and…
H-15A Hot Mix Asphalt Applied (Ch 90 Eligible) to roadways in multiple towns in Franklin, Hampshire, Hampden, Berkshire, and Worcester Counties in FY27.…
Martha's Vineyard Regional High School Districts invites bid for the sale of four (4) surplus vehicles.
Excavation, transportation, and disposal of dewatered residuals. See Abington/Rockland Website for more details. arjww.org
The work involves all labor and materials necessary for the repainting of mostly walls, some ceilings, and exterior perimeter fascias Estimated construction…
The work involves all labor and materials necessary for the installation of VCT, LVP, rubber tile and base.. Estimated construction cost is one hundred fifty…
The work involves all labor and materials necessary for the installation of suspended acoustical tile ceilings and a smaller amount of adhered acoustical tile…
The Work under this Contract includes, but is not necessarily limited to, the removal and replacement of approximately 4,200 linear feet of existing 6-inch…
Official Bonfire public listing for Great Lakes Water Authority. Reference REQ - 0009292. Open the official portal for full documentation, attachments, and…
The University of Massachusetts Medical School - "UMMS" - is utilizing a new online procurement system called "Jaggaer BuyWays Event Portal" to post…
RFQ/P for Technical Assistance to the South Boston Neighborhood Working Group in the Review of Three