2026 On-Call Asphalt Berm Repair and Maintenance Services
Seeking qualified consultants to provide on-call asphalt berm repair and maintenance services.
Filter and search for solicitations and contract listings.
Seeking qualified consultants to provide on-call asphalt berm repair and maintenance services.
District-wide Security Camera Design Andinstallation Projects
Invitation for Bids for trucking and debris removal services with a five-year contract term, requiring bids to be submitted by February 16, 2026.
Seeking a developer to provide preconstruction and construction services for the Fillmore Portable Replace Project, including design review, value engineering, cost estimation, and construction management.
Carmel Meadows Easement Sewer Pipeline Repair
Seeking qualified consultants to conduct a flood study that will assess storm drain systems, perform modeling, and provide engineering services to develop cost-effective flood reduction alternatives.
Seeking proposals for as-needed third-party cost estimating, constructability, scheduling, and contracting advisory services for water facilities with a 3-year contract and two 1-year renewal options.
Seeking chemical supplies including aqueous Ammonia, Ferric Chloride, Ferrous Chloride, Sodium Bisulfite, Sodium Hydroxide, and Sodium Hypochlorite.
Seeking contractor to provide waste collection services with three 40 cubic yard containers and one 10 cubic yard container for non-hazardous waste disposal, with container exchanges required within two business days of notification.
Seeking installation of channelizers on I-10 and I-110 Freeways, and maintenance of channelizers on I-10, I-110, and I-105 Freeways where double-white longitudinal pavement markings exist.
Pre-qualification applications are being requested for a Security Cameras and Infrastructure Project involving upgrades across multiple campuses.
Seeking proposals for prisoner custody transport and booking services including transport of arrested individuals to various facilities and completion of booking procedures.
Seeking contractor for UPS equipment removal, installation, and configuration services for network equipment support.
Independent auditor needed to prepare Annual Comprehensive Financial Report (ACFR) compliant with GASB pronouncements and perform audits of all funds in accordance with accepted auditing standards.