FY28 Water Treatment Plant Improvements Projects – Professional Services
Fy28 Water Treatment Plant Improvements Projects – Professional Services
Filter and search for solicitations and contract listings.
Fy28 Water Treatment Plant Improvements Projects – Professional Services
Seeking contractor to remove and replace existing roof and HVAC units at a community college campus according to design specifications.
Seeking janitorial services for multiple pumping plant facilities, including daily cleaning, disinfection, trash removal, and maintenance of restrooms, floors, and common areas.
Fully Equipped Mobile Ambulance Simulator
Informal bidding pre-qualification application outlining minimum contract requirements for public works projects including prevailing wages, bonds, licensing, and comprehensive insurance coverage requirements.
Environmental boring and drilling project to install five groundwater monitoring wells and advance six soil borings for soil and groundwater sample collection.
Support services are needed for Industrial Control System Phase 1 Review at Edwards AFB in accordance with PWS dated 22 January 2026. Quotes are due on 20 February 2026.
Seeking radio frequency testing equipment with comprehensive capabilities including cable and antenna testing, spectrum analysis, and 5G NR measurements in a single handheld device.
Solicitation for rental production equipment including various lighting, grip, and camera support equipment for film/video production.
Seeking contractor to perform multi-use pathway improvements including concrete and asphalt replacement, landscaping, drainage improvements, and lighting installations.
Seeking up to three construction firms to perform on-call pavement improvement projects based on individual Task Orders.
Seeking contractor for Phase 1B Stages 4 and 5 Liner Construction Project at a sanitary landfill, including excavation, blasting, screening, and stormwater compliance tasks.
Seeking contractor to perform tenant improvements on the 3rd floor of the University Center, including construction of three offices with associated demolition, finishes, and building system modifications.
This project involves remediation of PCE/TCE soil vapor contamination, including concrete removal, contaminated soil extraction, installation of vapor barriers and a sub-slab depressurization system, and concrete replacement.
Window replacement project involving removal and installation of dual-glazed aluminum windows at multiple buildings, along with restroom upgrades and replacement of a non-accessible entrance gate.
Seeking contractor to perform dredging, dewatering, hauling, and land application of biosolids from three ponds at a water recycling plant.
Seeking a supplier to provide custodial supplies for Yosemite National Park for fiscal year 2026.
Project seeks contractor to provide ADA sidewalk improvements through a Community Development Block Grant. Work includes labor, materials, equipment, and other necessary components, with bid, payment, and performance bonds required.
Seeking contractor to provide wildfire fuel reduction vegetation and tree removal services, including qualified biologists, environmental protection measures, and traffic control.