SAFER Bay Project Design, Permitting and Bid Support
Design, permitting, and bid support services needed for a flood protection project that includes levee improvements, Bay Trail access enhancements, and habitat mitigation features.
Filter and search for solicitations and contract listings.
Design, permitting, and bid support services needed for a flood protection project that includes levee improvements, Bay Trail access enhancements, and habitat mitigation features.
Soliciting water meter samples for evaluation and standardization, with selected firms providing pricing for various meter sizes over a potential ten-year period.
Non-exclusive franchise agreement for tow services requiring 24/7 availability with response times of 30 minutes for standard tows and 40-60 minutes for big rig tows.
Road And Highway Building Materials (disposal Asphalt, Concrete)
Measure E Series 4 - College Park Es Nutrition Services And Northwood Hs Gym Expansions 2024
Project involves HVAC replacement in school kitchens, including removal of existing make-up air units and installation of new make-up air units and package heat pumps to balance kitchen hoods and condition kitchen spaces.
Proposals are invited for a Software as a Service cloud-based Automated Passenger Counter data refinement and reporting solution for a fleet of 180 buses.
Seeking a Succession Planning Consultant to assist with executive leadership transitions while strengthening organizational continuity and leadership capacity.
A countywide emergency evacuation study is being solicited to provide planning resources for emergency preparedness and evacuation events, focusing on route analysis, community identification, and transportation options.
$230m Usace South Pacific Division (spd) Regional Ae Vertical Design Matoc
Seeking APC SMART UPS (uninterruptible power supply) batteries, specifically the SMART UPS SRT 5000VA RM 208V, part number SRT5KRMXLT.
Requesting proposals from qualified towing companies to perform exclusive police towing and storage services including vehicle towing and impound services.
Engineering firm sought to develop comprehensive construction plans for two designated parking areas at Howard Park, including stormwater management, landscape design, and site improvements.
Security improvements project requiring installation of CMU wall toppers and replacement of swing gates with rolling gates at a pump station.
The Library Northeast Ramp Project involves upgrading an existing ramp with ADA compliant handrails, integrated LED lighting, and addressing drainage issues through waterproofing and new drainage systems.
Seeking bids for construction of a 4.2-mile 60-kV overhead electrical transmission line with 12.5-kV distribution underbuild and fiber optic cable installation.
Project involves installation of on-ramp metering, new streetlight, signage, and striping for traffic management.
Seeking consultants to provide pavement condition data collection and analysis services, including updating the StreetSaver® Pavement Management Application database with field survey results.