Skip to content
County of Kenosha

Kenosha County Public Safety Building AHU Replacement

Solicitation: Not available
Notice ID: wi_vendornet__1dce5d14-fe0f-f011-9060-00505684483d
DepartmentCounty of KenoshaStateWIPostedApr 02, 2025, 12:00 AM UTCDueMay 07, 2025, 01:00 PM UTCExpired

Federal opportunity from County of Kenosha. Place of performance: WI. Response deadline: May 07, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Point of Contact

Not available

Agency & Office

Department
County of Kenosha
Agency
Not available
Subagency
Not available
Office
Matthew Fleming <matt.fleming@kenoshacountywi.gov>; Matthew Fleming, Phone: 262-653-2527 Fax: 262-653-2604
Contracting Office Address
Not available

Description

The County of Kenosha Wisconsin (County), through its Purchasing Division (Purchasing), requests bids to establish a contract for the replacement of air handler units at the Public Safety Building, 1000 55th Street, Kenosha, WI 53140. Work of the Project includes the following: Selective demolition and disposal. Remove existing dual duct air handling unit, return fan, condensing unit, dual duct VAV boxes, associated controls and piping. Install new air handling unit, condensing unit rooftop equipment and VAV boxes with new equipment. Make all required piping, ductwork and electrical connections to the new equipment. Provide new controls for all equipment replaced as part of this project. Make architectural and structural changes as required to replace existing equipment. Integrate existing fire alarm devices into new equipment where equipment replacement occurs.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.