2026 Partial Roofing RFP Chequamegon School District
Federal opportunity from Chequamegon School District. Place of performance: WI. Response deadline: Mar 10, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The project generally consists of removal and disposal of existing roofing materials including: existing EPDM roof membrane, EPDM flashings, EPDM accessories, metal fascias, metal copings and installing a new Carlisle Sure-Seal Design "B" Loose Laid Ballasted Roofing System, or equivalent, utilizing .060” non reinforced EPDM membrane in conjunction with EPDM accessories and new metal fascias and copings. The existing roof insulations are intended to remain in place, providing they are not damaged and are dry. Existing stone ballast may be reused. Refer to attached Roof Plan for designated roof areas to be re-roofed. Project should include additional 3” of R-17 insulation on all roofs.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.