Wilderness WWTF Clarifier Refinishing
Federal opportunity from Rapidan Service Authority. Place of performance: VA. Response deadline: Mar 03, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
This project includes the refinishing of the three (3) clarifiers at the Wilderness Wastewater Treatment Facility. The purpose of the work is to address the ongoing degradation of the concrete, which has become more porous with exposed aggregate, leading to increased algae growth, and to restore the internal metal equipment, which is peeling and flaking. Each clarifier will be taken offline individually to allow recoating of the concrete structures and internal metal equipment as shown on the project drawings. Clarifiers will be drained, cleaned, and prepared to receive the specified coatings. Internal metal equipment will be removed, surface-prepared, and coated prior to reinstallation. All coated equipment will be reinstalled and inspected by the Owner before clarifier start-up. Mandatory Pre-Bid Conference: February 6, 1pm at the Treatment Plant.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.