02262026-1000 Massaponax High Roof Replacement
Federal opportunity from L088SPOTSCTYSCH • Spotsylvania County Public Schools. Place of performance: VA. Response deadline: Feb 26, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
A. SBCS is requesting bids from Offerors for replacement of the low slope roof system at Massaponax High School. The project generally involves removal of all ballast and existing EPDM membrane, installation of new coverboard and a fully adhered EPDM membrane. The project is approximately 206,000 ft2.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.