RFQ 692012: Stormwater Facility JC77 Wet Pond Retrofit
Federal opportunity from LA46LOUDOUN • County of Loudoun. Place of performance: VA. Response deadline: Feb 26, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ATTENTION: Visit www.loudoun.gov/bids to download the full solicitation for details on the submission process. Online responses in EVA will not be accepted or considered. The intent of this Invitation for Bid (IFB) is for the County of Loudoun, Virginia (County) to obtain the services of a qualified General Contractor to perform the Work to retrofit and convert Stormwater Facility JC77 from a Level I Wet Pond to a Level II Wet Pond within South Riding Section 65, a platted subdivision of the South Riding community (the Project). The Work includes removal, hauling, and disposal of accumulated sediment; installation of one (1) sediment forebay at existing inflows; construction of one (1) wetland cell and one (1) main pond cell with safety and aquatic benches; replacement of gravel on the existing dam embankment access road; and installation of landscape plantings. The Project will require the removal of approximately 1,000 cubic yards of cut material.The Project is located within Section 65 of the South Riding community, adjacent to Conklin Community Park at 25710 Donegal Drive, Chantilly, Virginia 20152. The Project limits span over two (2) parcels, one (1) owned by South Riding Proprietary and one (1) owned by the County Board of Supervisors.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.