S. Main Street Area Improvement Project-Street and Storm Drainage
Federal opportunity from L028EMPORIACITY • City of Emporia. Place of performance: VA. Response deadline: Feb 26, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Street Improvements: Curb and gutter improvements, existing sidewalk repaired, and three driveways will have curb cuts incorporated to improve pedestrian access and safety on Clay Street. Storm Drainage Improvements: Drainage swell along Zion Blvd. will be regraded to direct storm-water away from low areas which pond.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.