Bid B00126 - Staunton Water Treatment Plant Fluoride Tank Replacement
Federal opportunity from LA35STAUNTNCITY • City of Staunton. Place of performance: VA. Response deadline: Mar 05, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Performing all work necessary at the Staunton Water Treatment Plant to demolish an existingfluoride tank, concrete containment area and chemical feed piping, and constructing a new fluoridetank, concrete containment area and chemical feed piping. Other Work indicated in the ContractDocuments.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.