Nelson County Tipping Floor IFB#2026-NCTIP
Federal opportunity from L030NELSONCNTY • Nelson County. Place of performance: VA. Response deadline: Mar 04, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The project generally includes: Demolition of an existing reinforced concrete slab totaling approximately 2,400 square feet and portion of an existing concrete barrier wall totaling approximately 49 linear feet. Then a new 8â hardened concrete slab, approximately 7â tall barrier wall, and 20â wide concrete apron will be installed. An existing floor drain will be cleared of all obstructions and a new cover grate installed. Damaged metal wall panels around the perimeter of the structure will be removed and replaced sealing gaps and holes in the wall.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.