RFQ 692011: Conklin Park Stream Restoration & Constructed Wetland
Federal opportunity from LA46LOUDOUN • County of Loudoun. Place of performance: VA. Response deadline: Mar 10, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ATTENTION: Visit www.loudoun.gov/bids to download the solicitation for full details on the submission process. Online responses in EVA will not be accepted or considered. The intent of this Invitation for Bid (IFB) is for the County of Loudoun, Virginia (County) to obtain the services of a qualified General Contractor (GC) to perform the Work to restore approximately 2,200 linear feet of an unnamed tributary to Elk Lick Run and approximately 200 linear feet along three (3) outfall channels that discharge into the unnamed tributary through the use of Rosgen Natural Channel Design (NCD) techniques, and the creation of a Level 2 constructed wetland in accordance with Virginia (VA) Department of Environmental Quality (DEQ) Stormwater Specification Number (No.) 13. The stream restoration includes three (3) reaches, the limits of which begin at a 5â x 14â triple barrel Conspan arch and single box culvert underneath Donegal Drive, and end at a 5â x 15â quadruple-box culvert at Loudoun County Parkway. There is one (1) pedestrian bridge crossing, three (3) mountain bike crossings, and two (2) plunge pools. The constructed wetland includes the one (1) access road, one (1) sediment forebay, three (3) deep pools, and one (1) outfall structure. The Project will also include the installation of riparian and wetland plantings.The Project is located within Conklin Community Park in South Riding. The Project limits are located on two (2) separate parcels, one (1) owned by South Riding Proprietary and one (1) owned by the Loudoun County Board of Supervisors.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.