Thompson Hall Connection to CHCP Loop
Federal opportunity from A247GMU • George Mason University. Place of performance: VA. Response deadline: Mar 23, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
PART A â Construction services for the Installation of underground chilled water supply and return from campus hot and chilled plant loop to Thompson Hall. Project includes all associated work inside and outside of the buildings including but not limited to removal, salvage, demolition and replacement of all site and building features as necessary. The project includes all associated temporary environmental controls and maintenance of circulationPART B - Attachment G - Siemens Scope of Work - 12.05.25 - The Contractor agrees that it will use as the subcontractor for Work shown on the drawings and within the specifications, Siemens Industry, Inc., a subcontractor selected by the Owner, for a subcontract price of $106,539.78, and that this quote has been included in the TOTAL BASE BID AMOUNT. The Contractor agrees that it will be responsible for this subcontractor and its work just as if it had been selected by the Contractor.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.