IFB 26-001-2230 Burson Drive Sewer Extension -Cost Participation
Federal opportunity from LA07CHESAPECITY • City of Chesapeake. Place of performance: VA. Response deadline: Feb 23, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The Work under this Project consists of approximately 1,100 LF of 8-inch PVC C-900 Gravity Sewer, including manholes, residential sanitary sewer cleanouts, and connection to the existing gravity sewer manhole near the intersection of McCoy Road and Burson Drive. Approximately 200 LF of 4-inch ductile iron low-pressure force main, including pigging station, residential cleanouts, and connection to the proposed 8-inch gravity sewer as shown on the Contract Drawings. Associated water main relocations, water service relocations, pavement restoration and mill and overlay, as well as restoration as shown on the Contract Drawings shall be completed.All information and bidding process can be found in OpenGov at https://procurement.opengov.com/portal/cityofchesapeakeva/projects/195123
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.