ITB No. 25-2876-9JL - Richmond Henrico Turnpike Improvements
Federal opportunity from LA22HENRICOGOVT • Henrico County Government. Place of performance: VA. Response deadline: Mar 05, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The Work consists of improvements to Richmond-Henrico Turnpike (R-HT) beginning at the intersection of Laburnum Avenue and ending at the intersection of Hummingbird Road. The length of improvements are approximately 1.15 miles. Improvements will consist of a four-lane curb and gutter roadway with either a flush shared center left turn lane or a raised median, a ten-foot shared use path with lighting on the eastern side and a five-foot sidewalk on the western side of R-HT. Enclosed drainage will be provided throughout the project limits as well as two stormwater management facilities, public water, sanitary sewer, signing and pavement markings. The project crosses Horse Swamp Creek where a new triple ten-foot by ten-foot box culvert will be installed. This project will be built according to the latest VDOT Road and Bridge Specifications.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.