Skip to content
Rapidan Service Authority

Wilderness WWTF Clarifier Refinishing

Solicitation: Not available
Notice ID: vaeva_e0d1df5ad6182c76a35d015206a1caaf2bef3504
DepartmentRapidan Service AuthorityAgencyL572rsaStateVAPostedFeb 16, 2026, 12:00 AM UTCDueMar 03, 2026, 12:00 AM UTCCloses in 4 days

Federal opportunity from L572RSA • Rapidan Service Authority. Place of performance: VA. Response deadline: Mar 03, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for VA
Live POP
Place of performance
36075 Wilderness Shores Way, Locust Grove, VA 22508
State: VA
Contracting office
Not listed

Point of Contact

Name
David Jarrell
Email
Not available
Phone
Not available

Agency & Office

Department
Rapidan Service Authority
Agency
L572RSA
Subagency
L572RSA
Office
David Jarrell
Contracting Office Address
Not available

Description

This project includes the refinishing of the three (3) clarifiers at the Wilderness Wastewater Treatment Facility. The purpose of the work is to address the ongoing degradation of the concrete, which has become more porous with exposed aggregate, leading to increased algae growth, and to restore the internal metal equipment, which is peeling and flaking. Each clarifier will be taken offline individually to allow recoating of the concrete structures and internal metal equipment as shown on the project drawings. Clarifiers will be drained, cleaned, and prepared to receive the specified coatings. Internal metal equipment will be removed, surface-prepared, and coated prior to reinstallation. All coated equipment will be reinstalled and inspected by the Owner before clarifier start-up. Mandatory Pre-Bid Conference: February 6, 1pm at the Treatment Plant.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.