Skip to content
DOC - Architecture and Engineering

Baskerville Roof Replacement, 799-B4799-006

Solicitation: Not available
Notice ID: vaeva_20f12aace80bb06485c7af9c189e8fe609ecec6d
DepartmentDOC - Architecture and EngineeringAgencyA799StateVAPostedJan 30, 2026, 12:00 AM UTCDueMar 10, 2026, 02:00 PM UTCCloses in 15 days

Federal opportunity from A799 • DOC - Architecture and Engineering. Place of performance: VA. Response deadline: Mar 10, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$964,691,384
Sector total $964,691,384 • Share 100.0%
Live
Median
$107,325
P10–P90
$28,414$4,168,590
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($964,691,384)
Deal sizing
$107,325 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for VA
Live POP
Place of performance
Baskerville Correctional Center, 4150 Hayes Mill Rd, Baskerville, VA 23915
State: VA
Contracting office
Not listed

Point of Contact

Name
Marguerite McCormack
Email
Not available
Phone
Not available

Agency & Office

Department
DOC - Architecture and Engineering
Agency
A799
Subagency
A799
Office
Marguerite McCormack
Contracting Office Address
Not available

Description

This project is gernerally described as installation of retrofit roof system over existing standing seam metal roof system on select buildings at the Baskerville Correctional Center. The existing metal roof is to be left in place and insulation placed in between the flutes, followed by installation of cover board and the new roof membrane. All related flashings, penetrations, and curbs are encompassed in the roof retrofit and other work indicated in the Contract Documents.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.