Asphalt for Weber County Roads 2026
Federal opportunity from COUNTIES • Weber County. Place of performance: UT. Response deadline: Mar 10, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Asphalt for Weber County Roads 2026
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This notice (ut-u3p-223696) is titled “Asphalt for Weber County Roads 2026” and is issued under COUNTIES, indicating a county-level procurement. The only stated scope is asphalt supply for Weber County roads for 2026, with a response deadline of 2026-03-10T20:00:00+00:00. No attachments, specifications, quantities, delivery locations, or pricing structure are provided in the brief. A bidder should be prepared to clarify whether this is a materials-only asphalt supply contract or includes delivery/logistics and what mix designs and quality standards are required.
Secure a source of asphalt for Weber County road work during 2026, likely through a competitively awarded county contract with defined mix/grade requirements, delivery/plant pickup terms, and unit pricing.
- Provide asphalt for Weber County Roads (2026 requirement)
- Support ordering/dispatch and fulfillment aligned to county road projects during 2026 (details not provided)
- Meet applicable asphalt mix design/quality requirements (not provided in brief)
- Confirmation of offer validity through the response deadline (2026-03-10T20:00:00+00:00)
- Pricing proposal for asphalt (unit pricing basis to be confirmed: per ton, per mix type, etc.)
- Product/mix information for asphalt offered (mix types/grades/standards to be confirmed)
- Fulfillment plan (delivery vs plant pickup; hours of operation; lead times—details to be confirmed)
- Company qualifications to supply road asphalt for a county road program (relevant past performance references, if requested in the solicitation)
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Complete solicitation package (solicitation number, instructions, forms, and addenda)
- Asphalt specifications (mix designs/grades, governing standards, testing/acceptance)
- Estimated quantities/tonnage and ordering schedule for 2026
- Delivery requirements and locations (FOB plant vs delivered to job sites within Weber County)
- Contract term structure and period of performance dates
- Evaluation criteria and award basis
- Required certifications, insurance, bonds, or vendor registration details
- Point of contact and Q&A process
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.