UDOT I-70 Concrete Panel Replacement Sevier County
Federal opportunity from EXECUTIVE BRANCH AGENCIES • Utah Department of Transportation. Place of performance: UT. Response deadline: Mar 05, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
UDOT I-70 Concrete Panel Replacement Sevier County
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The UDOT I-70 Concrete Panel Replacement project in Sevier County aims to enhance infrastructure durability and safety. Responses are due by March 5, 2026, allowing ample time for preparation. This project presents a significant opportunity for firms specializing in concrete work and highway construction.
Replace concrete panels on I-70 to improve road safety and serviceability in Sevier County.
- Assessment of existing concrete conditions
- Design and engineering for new concrete panels
- Removal and disposal of old concrete
- Installation of new concrete panels
- Quality assurance and compliance inspections
- Company qualifications and past performance
- Detailed project approach and methodology
- Cost proposal with itemized pricing
- Timeline and schedule for completion
- References from similar projects
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Exact scope of work details
- Specific material requirements
- Design standards to be followed
- Any mandatory pre-bid meetings or site visits
- Contact information for project manager
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.