PWO128938 Magna Salt Shed Improvement-CONST
Federal opportunity from COUNTIES • Salt Lake County. Place of performance: UT. Response deadline: Mar 12, 2026.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 49 more rate previews.↓
Point of Contact
Agency & Office
Description
PWO128938 Magna Salt Shed Improvement-CONST
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves construction improvements for the Magna Salt Shed as indicated in notice ID PWO128938. This project is listed under the Counties agency and has a response deadline set for March 12, 2026. Bidders should be prepared to address specific construction requirements related to the enhancements requested for the salt shed.
The buyer seeks to solicit proposals for the construction improvements to the Magna Salt Shed, enhancing its functionality and durability.
- Construction firms with experience in building maintenance and improvements
- General contractors specializing in municipal projects
- Companies with strong safety records in construction
- Company overview and capabilities
- Project timeline proposal
- Detailed construction plan
- Cost estimate and pricing breakdown
- Safety and risk management plans
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Consider offering a competitive pricing strategy to accommodate expected municipal budget constraints.
- Include warranty and maintenance options in the cost proposal to enhance value.
- Consider teaming with local subcontractors experienced in municipal construction to strengthen the proposal.
- Engage with specialized consultants for environmental compliance if needed.
- Potential delays in project approval due to budget constraints or municipal regulations.
- Supply chain issues may affect material availability and project timeline.
- What specific improvements are required for the Magna Salt Shed?
- Are there hidden constraints due to local regulations that bidders should be aware of?
- What are the expected timelines for project milestones?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No detailed scope of work provided
- Lack of information on specific construction standards required
- No NAICS or PSC codes listed for classification
- No contact information for buyer
- Absence of project timeline beyond response deadline
- No attachments or links for further clarification
- No details on the evaluation criteria for bids
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.