Artesian 1 Well Project
Federal opportunity from CITIES • Salt Lake City Corporation. Place of performance: UT. Response deadline: Mar 06, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 35 more rate previews.↓
Point of Contact
Agency & Office
Description
Artesian 1 Well Project
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Artesian 1 Well Project is being launched by the CITIES agency, with a response deadline of February 27, 2026. This initiative aims to establish a new water supply source, indicating the importance of sustainable water management in urban areas. Given the project's nature, potential bidders should focus on their experience in well drilling and sustainable practices.
The buyer aims to implement a project to develop the Artesian 1 Well, which will provide a reliable water source to the community.
- Companies specializing in water resource management
- Well drilling contractors
- Environmental engineering firms
- Consultants in sustainable water practices
- Conduct geological surveys
- Drill Artesian well
- Install water supply systems
- Test and ensure water quality
- Implement sustainability measures
- Technical proposal outlining approach
- Qualifications and experience of key personnel
- Project timeline and milestones
- Cost estimation breakdown
- References from similar projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to local environmental regulations
- Follow safety protocols during drilling
- Consider cost-effective drilling technologies
- Factor in long-term sustainability measures to attract client interest
- Collaborate with local geological experts
- Engage environmental consultants for compliance
- Potential delays due to unforeseen geological conditions
- Regulatory changes affecting project implementation
- Public opposition to water resource projects
- What are the expected water quality standards for the project?
- Are there any specific environmental regulations we need to comply with?
- What is the anticipated budget range for the project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed project specifications
- Budget details for the project
- Location of the well site
- Geological data available for bidders
- Specific agency contacts for questions
- Potential partnering opportunities
- Previous project success metrics
- Environmental impact assessments required
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.