Skip to content
Moab City

Moab Water Tank Painting Project

Solicitation: Not available
Notice ID: ut-u3p-221518
DepartmentMoab CityAgencyCitiesStateUTPostedDueMar 10, 2026, 08:00 PM UTCCloses in 12 days

Federal opportunity from CITIES • Moab City. Place of performance: UT. Response deadline: Mar 10, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Utah
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Moab City
Agency
CITIES
Subagency
CITIES
Office
Not available
Contracting Office Address
Not available

Description

Moab Water Tank Painting Project

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 26, 2026
Executive summary

The Moab Water Tank Painting Project, associated with the CITIES agency, seeks contractors to undertake the painting of water tanks. This project is crucial for maintaining the infrastructure and aesthetic appeal of the water service in Moab. Responses are due by March 10, 2026, allowing ample time for interested bidders to prepare their proposals.

What the buyer is trying to do

The buyer is looking to maintain and enhance the water infrastructure in Moab by completing a water tank painting project, ensuring both functionality and visual appeal.

Work breakdown
  • Assess existing condition of water tanks
  • Prepare surface for painting
  • Apply protective coating
  • Ensure compliance with safety regulations
Response package checklist
  • Company credentials and past project examples
  • Work plan detailing project approach
  • Safety and compliance certifications
  • Pricing proposal breakdown
  • Timeline for project completion
Suggested keywords
Moab water infrastructuretank paintingmunicipal projectsenvironmental compliance
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific budget range indicated
  • No detailed specifications for painting materials
  • No requirements for project duration stated
  • No information about the selection process
  • No constraints on contractor size noted
  • No contact information for the buyer provided
  • No information on performance metrics or guarantees
  • No attachment or link to detailed requirements

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.