City of Green River- Airport Engineering Services
Federal opportunity from Division of Purchasing. Place of performance: UT. Response deadline: Feb 20, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 49 more rate previews.↓
Point of Contact
Agency & Office
Description
City of Green River- Airport Engineering Services
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Green River is soliciting proposals for Airport Engineering Services, with responses due by February 20, 2026. This opportunity will involve providing engineering support for the City’s airport projects. Specific details regarding scope, requirements, and the evaluation process are not provided in the brief.
The City seeks qualified firms to offer engineering services related to airport developments and improvements.
- Engineering firms with airport experience
- A/E firms knowing FAA regulations
- Local firms with experience in municipal projects
- Assess existing airport infrastructure
- Design engineering solutions for airport upgrades
- Provide project management for airport construction projects
- Company qualifications and experience
- Proposed project approach
- References from previous airport projects
- Cost proposal for engineering services
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure compliance with FAA standards
- Adhere to local and state regulations
- Submit all required certifications
- Consider a competitive pricing model based on service scope
- Include potential for fixed-price or time-and-materials approaches
- Factor in travel and operating costs specific to airport projects
- Look for local subcontractors with airport project experience
- Consider teaming with firms proficient in environmental assessments
- Leverage specialists in FAA compliance
- Potential changes in FAA funding or regulations
- Competition with regional engineering firms
- Delays due to project permitting processes
- What specific airport projects are prioritized by the City?
- Are there existing studies or plans available for review?
- What is the budget range for engineering services?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed scope of services required is not specified
- No information on funding sources for the project
- Lack of specific qualifications or certifications requested
- Unclear evaluation criteria for proposals
- No details on past projects or benchmarks provided
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.