NC26-59 Central Region Guzzler Lift FY26
Federal opportunity from Division of Purchasing. Place of performance: UT. Response deadline: Mar 06, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
NC26-59 Central Region Guzzler Lift FY26
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The NC26-59 Central Region Guzzler Lift project posted by the Division of Purchasing is scheduled for response by March 6, 2026. This project is essential for enhancing waste removal and is expected to operate under the FY26 budget. The details are currently limited, making it important to formulate a strong capture strategy early to align capabilities with the requirements once they are more clearly defined.
The buyer aims to procure services or equipment related to the Guzzler Lift, which is likely focused on effective waste removal in the central region for FY26.
- Company profile and relevant experience
- Detailed pricing strategy for Guzzler Lift services
- Proposed timeline for delivery and implementation
- Quality assurance measures
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Scope details for the Guzzler Lift are not provided
- Agency-specific compliance requirements are unclear
- No specific PSC or NAICS codes listed
- Performance or delivery timelines are undefined
- No information on existing vendors or contracts related to this project
- Key performance indicators for the project performance are missing
- Clarification on budget availability for FY26 is needed
- Location details for the project execution are absent
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.